My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 4:41:12 PM
Creation date
6/3/2004 9:11:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Brewster tank site - prelim subdivision planning & design
RMP File Number
304.5
Date
3/11/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~', <br /> I <br /> .1 <br /> I~! ., PROÆCT UNDERSTAND!I~GfSCOPE!APPROACH <br /> -- ... ~ - .., ,-- ..~-. -"~ "- " w -- - ..~.. -, ""'" <br /> II <br /> "1 irr PROJECT UNDERSTANDING/SCOPE/APPROACH - <br /> J <br /> '] BREWSTER TANK SITE <br /> improvements on the site. <br /> 6. The City will provide a preliminary <br /> ] ASSUMPTIONS geotechnical report and an arborist report <br /> for on-site trees, if such reports are <br /> City will provide: available. <br /> ] ¡. Topographic and boundary surveys 7. AJI drawings wi11 be prepared on BKF <br /> ;,... Block book utility information title blocks. <br /> ;; Information on capacity of downstream storm 8. The area that will be disturbed by this <br /> and sewer systems project is more than one acre. A Storm <br /> ] ;;.. Water system pressures and availability Water Pollution Prevention Plan <br /> ¡;.. Preliminary Geotechnical report, if available (SWPPP) will be required for this project. <br /> ¡.. Arborist report on condition of trees, if available This fact wil1 be noted in the discussion of <br /> ] each alternative. <br /> 9. It is our understanding that the existing <br /> trees can be removed as necessary to <br /> accommodate development. <br /> 1 SCOPE OF SERVICES Prior to receiving Site Topography and <br /> Boundary Map <br /> :] PRIOR TO RECEIVING TOPOGRAPHY 1. Research existing City and County codes <br /> jr Research codes that could impact the development. If <br /> j.. Obtain record information available, these include, but are not <br /> ] .Ii' Meet with City limited to: <br /> f> City RH Zoning requirements <br /> ¡;.. City and County Development <br /> Codes <br /> ] ;,... City and County Grading Ordinance <br /> '" City and County Slope Density <br /> Ordinance <br /> ] ¡;.. ErR for adjacent developments, if <br /> ,j! available <br /> 2. Obtain block maps from San Mateo <br /> ~.~ County for the adjacent streets within <br /> j county jurisdiction. Obtain record <br /> information from PG&E, SBC and the <br /> Comcast or RCN for all streets <br /> surrounding the site. <br /> 3. BKF will meet with City staff to collect <br /> the existing on-site improvement plans, <br /> block maps showing utilities in Brewster <br /> Drive and Upland Road adjacent to the <br /> tank site and the Preliminary Geotechnical <br /> Report, if available. At this meeting, we <br /> will receive the infonnation regarding the <br /> off-site water and downstream storm drain <br /> and sanitary sewer systems, if available. <br /> We will discuss the City's development <br /> philosophy for the parcel to insure that we <br /> present alternatives that are compatible <br /> with the City's perceived site <br /> ""1 development. <br /> I Specific items to discuss include: <br /> .,00 rAllY knovVl1 neighborhood support or <br /> " <br /> wwW.bkr.cnm <br />
The URL can be used to link to this page
Your browser does not support the video tag.