Laserfiche WebLink
<br />~ <br /> <br /> <br /> <br />~ I~ PROJECT <br /> <br />_BlI8ak r PRO] ECT UN DERST AN DING/SCOPE/APPROACH <br />-. BREWSTER TANK SITE <br /> <br />include the following infonnation: <br />P Proposed lot layout, with <br />- approximate dimensions and areas <br />- of each lot. <br />;. Preliminary street grades and pad <br />..., elevations. Proposed contours will <br />; be included at the contour intervals <br />...J specified in the request for proposal. <br />The elevations will be established to <br />ì achieve an approximate earthwork <br />-' balance, if possible. No actual <br />earthwork quantities wìl1 be <br />J',',' calculated, and adjustments will be <br />, necessary when the construction <br />- documents are prepared. The on-site <br />improvement plans wi1l be used to <br />1 determine the approximate elevation <br />_I of the ground after the demolition <br />and removal of the existing tanks <br />'"""" and improvements. <br />; ;... Street right-of-way widths and <br />.- approximate centerline curve radii <br />will be indicated. <br />1 " Preliminary location and size of <br />.-: proposed domestic water, storm <br />drain and sanitary sewer facilities <br />will be indicated. Joint trench and <br />, fire hydrant locations will be shown. <br />...:. ;.. Any easements required by the <br />proposed development will be <br />..., indicated. <br />-' The site layouts will be prepared in <br />AutoCAD 2004 format. <br /> <br />3. Prepare a brief analysis of each site <br />-' layout, discussing the layout's merits and <br />disadvantages. This analysis may also <br />discuss alternatives for each layout, if <br />- appropriate. Alternatives could include <br />split level lots vs. retaining walls vs. 2: I <br />,.- ground slopes for selected lots. <br /> <br />-- Prepare Opinion of Probable Construction <br />Cost for each layout. <br /> <br />-- 4. Prepare a Development Feasibility Report <br />for the Site. In addition to the two site <br />layouts and the opinion of probable <br />construction cost for each. discussed <br />-- above, the report will include: <br /> <br />,;;. A more detailed project description <br />for each alternative, including a <br />discussion of existing <br /> <br /> <br />2004 www.bkr.Gom <br />