My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 4:41:12 PM
Creation date
6/3/2004 9:11:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Brewster tank site - prelim subdivision planning & design
RMP File Number
304.5
Date
3/11/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I <br /> .~ PROJECT UNDERSTANDING/SCOPE/APPROACH <br /> I =a, PROJECT UNDERSTANDING/SCOPE/APPROACH <br /> I Bkf BREWSTER TANK SITE <br /> encroachments, site access, zoning <br /> I and general plan conformance, <br /> individual utility analysis, grading <br /> concerns, flood hazard information <br /> and wetland issues, if any. <br /> J ). Contact lists for City and District <br /> personnel <br /> ¡.. An estimate of City and District fees <br /> for the development <br /> J :Y A design cost estimate including; <br /> \ <br /> i civil engineering, surveying, <br /> geotechnical engineering, joint <br /> j trench design, structural design <br /> (excluding buildings), traffic <br /> engineering, landscape architect and <br /> title company fees. <br /> j ¡.. Site photographs <br /> PROJECT APPROACH Approach to Maximizin2: Development <br /> 1 <br /> J We propose to use to following approach to <br /> MAXIMIZING DEVELOPMENT maximize the yield on this project: <br /> Þ Abandon or relocate appropriate <br /> J )0- Abandon or relocate easements easements to provide maximum <br /> ,. Design streets flexibility in street and lot layout. <br /> " Configure elevation differences ¡... Design all streets to be double <br /> ~,I ¡;.. Propose biofiltration loaded if the site dimensions and <br /> y Propose variances topography will allow <br /> iii 'r Maintain balance 'r Take up elevation differences using <br /> split level pads and/or retaining <br /> -"1 walls whenever doing so will <br /> 'j <br /> OJ increase tlle yield. <br /> III'i <br /> ¡... Propose biofiltration swales only in <br /> 1 instances where doing so will not <br /> .! cause a reduction in yield. Use <br /> . alternate clean water devices in <br /> instances where yield would be <br /> ¡ impacted. <br /> iii ¡... Propose variances to the zoning <br /> ordinance in cases where a very <br /> 'J minor variance will produce an <br /> ! additional lot. <br /> Ii );;- Attempt to maintain an on-site <br /> earthwork balance for the project. <br /> ili1 <br /> Thank you again for considering BKF for this project. If you have any questions regarding the enclosed scope of <br /> services, fee schedule, or require additional information please do not hesitate to call Dave Evans or Dennis Neary at <br /> (650) 482-6300. <br /> iI <br /> "jj <br /> i Date: February 1 ì 2004 w\Nw.bkv.cúm <br />
The URL can be used to link to this page
Your browser does not support the video tag.