Laserfiche WebLink
<br /> I <br /> .~ PROJECT UNDERSTANDING/SCOPE/APPROACH <br /> I =a, PROJECT UNDERSTANDING/SCOPE/APPROACH <br /> I Bkf BREWSTER TANK SITE <br /> encroachments, site access, zoning <br /> I and general plan conformance, <br /> individual utility analysis, grading <br /> concerns, flood hazard information <br /> and wetland issues, if any. <br /> J ). Contact lists for City and District <br /> personnel <br /> ¡.. An estimate of City and District fees <br /> for the development <br /> J :Y A design cost estimate including; <br /> \ <br /> i civil engineering, surveying, <br /> geotechnical engineering, joint <br /> j trench design, structural design <br /> (excluding buildings), traffic <br /> engineering, landscape architect and <br /> title company fees. <br /> j ¡.. Site photographs <br /> PROJECT APPROACH Approach to Maximizin2: Development <br /> 1 <br /> J We propose to use to following approach to <br /> MAXIMIZING DEVELOPMENT maximize the yield on this project: <br /> Þ Abandon or relocate appropriate <br /> J )0- Abandon or relocate easements easements to provide maximum <br /> ,. Design streets flexibility in street and lot layout. <br /> " Configure elevation differences ¡... Design all streets to be double <br /> ~,I ¡;.. Propose biofiltration loaded if the site dimensions and <br /> y Propose variances topography will allow <br /> iii 'r Maintain balance 'r Take up elevation differences using <br /> split level pads and/or retaining <br /> -"1 walls whenever doing so will <br /> 'j <br /> OJ increase tlle yield. <br /> III'i <br /> ¡... Propose biofiltration swales only in <br /> 1 instances where doing so will not <br /> .! cause a reduction in yield. Use <br /> . alternate clean water devices in <br /> instances where yield would be <br /> ¡ impacted. <br /> iii ¡... Propose variances to the zoning <br /> ordinance in cases where a very <br /> 'J minor variance will produce an <br /> ! additional lot. <br /> Ii );;- Attempt to maintain an on-site <br /> earthwork balance for the project. <br /> ili1 <br /> Thank you again for considering BKF for this project. If you have any questions regarding the enclosed scope of <br /> services, fee schedule, or require additional information please do not hesitate to call Dave Evans or Dennis Neary at <br /> (650) 482-6300. <br /> iI <br /> "jj <br /> i Date: February 1 ì 2004 w\Nw.bkv.cúm <br />