7.1.B. - Page 14 <br /> TASK 3—COMPOSITE CAD LAYOUT OF ALL UTILITY JT SKETCHES <br /> Consultant will receive utility company conductor design sketches from Astound, PG&E, Comcast and <br /> AT&T. These plans will be in various formats and scales in PDF and hardcopy. Consultant will review the <br /> utility company drawings to identify the number and size of conduits for each segment of the project, <br /> along with the number, size and location for each vault. The various designs will be rectified between <br /> the utility companies to develop agreed upon locations for vaults, while meeting each utility company's <br /> needs for access. Consultant will label each segment of joint trench(A, B, C, D etc) based on the trench <br /> occupancy by various utility company conduits. Consultant will number each segment (1, 2, 3 etc.)with <br /> the same trench occupants.The composite layout will include the number and size of conduits for each <br /> utility company in each segment of trench. The plan will be completed in CAD on the project aerial <br /> topographic survey base,and will be plotted at scale 1"=20'. This CAD layout will be prepared for review <br /> of the utility companies. <br /> Consultant will prepare a PG&E Standard Construction & Labor Summary sheet showing key work items <br /> to be performed by the City's Joint Trench Contractor and work by each individual utility company. <br /> These include items such as trenching (excavate, backfill & compact), PG&E electric transformer <br /> enclosures, sidewalk enclosures, splice boxes, conduits, wires, switchgears & transformers, cable tv <br /> splice boxes,conduits,AT&T vaults,conduits,wires, street light conduits, boxes,street lights, (excavate, <br /> supply&install),removal of poles, luminaire etc. <br /> TASK 4—PRELIMINARY FORM B/CONSTRUCTION COST ESTIMATE <br /> After compiling the various utility company plans into an initial CAD base file,Consultant will prepare an <br /> initial construction cost estimate. The purpose of this task is to prepare a preliminary construction cost <br /> estimate to supplement the construction cost estimate for electrical work prepared by PG&E. PG&E's <br /> cost estimate, expected to be complete in early 2015, includes the cost for furnishing and pulling wires, <br /> furnishing and installing transformers, installing other electrical equipment,trenching and installing the <br /> panel conversions/service trenches, and removing power poles. Consultant will provide a cost estimate <br /> for the work that will be depicted on the City's Joint Trench Composite Drawings, which are the <br /> trenching & backfill, empty conduits, empty vaults, wet utility relocations, signal modifications, <br /> temporary bulbouts, and surface restoration. The Consultant cost estimate will be combined with the <br /> PG&E estimate and will be compared with the assessment allotment in the Rule 20A funds. <br /> Since the estimate of the composite drawing improvements is being prepared before the plans are <br /> prepared, Consultant will need to assume an average number of conduits for each block of joint trench, <br /> based on an initial review of the utility company plans. Consultant will assign an estimated cost to 4-6 <br /> levels of trench installation (example: level one-- 1 to 2 conduits, level two — 2 to 4 conduits shallow, <br /> level two-- 2 to 4 conduits deep, etc). The length of conduits will be measured polylines in AutoCAD <br /> with a percent increase to account for sweeps. Vaults will be counted per the utility company plans. If <br /> some of the utility company plans are incomplete Consultant will make assumptions for added conduits <br /> and boxes to include in the estimate. The cost estimate is to be considered a planning-level cost <br /> estimate with appropriate contingencies,to assist with project phasing decision making. <br /> TASK 5—COORDINATE COMPOSITE LAYOUT CHANGES WITH UTILITY COMPANIES <br /> Consultant will present the composite layout in a meeting with the utility companies and deliver copies <br /> to each utility company for their review and comment on the preliminary layout by consultant. Since <br /> the preliminary composite layout will include adjustments in the original utility layout request by the <br /> utility companies, the utilities will have an opportunity to review and comment on the combined layout, <br /> REV:02-24-15 VR <br /> Page 11 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />