Laserfiche WebLink
7.1 .B. - Page 23 <br /> EXHIBIT"B" <br /> COST SCHEDULE <br /> Consultant shall perform the work for a not-to-exceed amount of $327,970. Consultant shall invoice <br /> monthly based on the percentage of work completed for each task consistent with the estimated costs <br /> outlined in the table below. <br /> TASK FEE <br /> la SUPPLEMENTAL SURVEYING FIRST MOVE-1N $8,500 <br /> lb SUPPLEMENTAL SURVEYING SECOND MOVE-IN $4,800 <br /> 2. FIELD SURVEYING OF PG&E SERVICES LATERALS $5,500 <br /> 3. COMPOSITE CAD LAYOUT OF ALL UTILITY COMPANY JT SKETCHES $21,300 <br /> 4. PRELIMINARY FORM B/CONSTRUCTION COST ESTIMATE $5,400 <br /> 5. COORDINATE COMPOSITE LAYOUT CHANGES WITH UTILITY COMPANIES $1,850. <br /> 6. . RISER POLE LAYOUT AND COORDINATION $6,200 <br /> 7A. 65%JOINT TRENCH PLANS $44,500 <br /> 7B. TEMPORARY LIGHTING PLANS $9,700 <br /> 8. 65%FORM B $10,800 <br /> 9. 65%TECHNICAL SPECIFICATIONS $3,700 <br /> 10. 65%CONSTRUCTION COST ESTIMATE $2,100 <br /> 11. SUBMITTAL REVIEW MEETINGS $4,200 <br /> 12. CALTRANS SUBMITTALS(SEPARATE PLANS) $1,000 <br /> 13. 95%SUBMITTAL $39,150 <br /> 14. QUALITY CONTROL PLAN REVIEW $4,600 <br /> 15. 100%SUBMITTAL $31,200 <br /> 16. BID PLANS,SPECIFICATIONS,ESTIMATE AND FORM B $12,500 <br /> 17. LEAD REGULAR UTILITY MEETINGS&PROJECT MANAGEMENT $8,000 <br /> 18. LEGAL DESCRIPTIONS(3) $6,600 <br /> 19. BOILERPLATE AND SPECIAL PROVISIONS $3,700 <br /> 20. PROGRAM SCHEDULING $3,000 <br /> ALLOWANCE FOR PRINTING $2,500 <br /> TOTAL $240,800 <br /> OPTIONAL TASKS FEE <br /> 1. POTHOLING $16,120 <br /> 2. SWPPP(PREPARED BYQSD) $5,000 <br /> 3. SIGNAL MODIFICATIONS(FOUR INTERSECTIONS) $23,300 <br /> 4, CALTRANS SUBMITTALS(SEPARATE PLANS) $16,750 <br /> 5. COUNTY PHASE 3-JOINT TRENCH COMPOSITE DRAWINGS $26,000 <br /> TOTAL $87,170 <br /> Combined all costs above: $327,970 <br /> REV:02-24-15 VR <br /> Page 20 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />