Laserfiche WebLink
7.1.B. - Page 22 <br /> Schedule <br /> TASK WORKING PREDECESSOR <br /> DAYS <br /> NTP <br /> la FIELD SURVEY#1 TOPO FIRST MOVE-IN 7 NTP <br /> lb FIELD SURVEY#2 TOPO SECOND MOVE-IN 7 Task 13 <br /> 2 FIELD SURVEYING OF PG&E SERVICE LATERALS 7 Completion of services <br /> installations <br /> 3 CONVERT JOINT TRENCH (JT)INTENT DRAWING INTO 15 Receipt of utility plans from <br /> COMPOSITE LAYOUT Utility Companies <br /> 4 PRELIMINARY FORM B/CONST.COST ESTIMATE 5 Task 3 <br /> 5 COORDINATE COMPOSITE LAYOUT CHANGES WITH N/A On going <br /> UTILITY COMPANIES <br /> 6 RISER POLE LOCATION 5 Task 3 <br /> 7A 65%JOINT TRENCH PLANS 35 After utility comments on Task <br /> 3 <br /> 7B TEMP LIGHTING PLANS N/A Concurrent with JT plans <br /> 8 65%FORM B See Task 5 Task 7A <br /> 9 65%TECHNICAL SPECIFICATIONS See Task 5 Task 7A <br /> 10 65%CONSTRUCTION COST ESTIMATE See Task 5 Task 7A <br /> 11 SUBMITTAL REVIEW MEETINGS N/A On-going <br /> 12 CALTRANS COORDINATION 7 Task 7A <br /> 13 95%PLANS,SPECIFICATIONS, ESTIMATE AND FORM B 30 After comments on Task 7A <br /> 14 OUTSIDE.PLAN REVIEW 10 Task 13 <br /> 15 100%PLANS,SPECIFICATIONS,ESTIMATE AND FORM B 20 After comments on Task 11 <br /> 16 BID PLANS,SPECIFICATIONS,ESTIMATE AND FORM B 10 After comments on Task 13 <br /> 17 LEAD REGULAR UTILITY MEETINGS N/A On-going <br /> 18 LEGAL DESCRIPTIONS 15 After title reports received <br /> 19 BOILERPLATE SPECS AND SPECIAL PROVISIONS N/A On-going <br /> 20 PROGRAM SCHEDULING NJA On-going <br /> REV:02-24-IS VR <br /> Page 19 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />