My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-03-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-03-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2015 8:19:24 AM
Creation date
3/5/2015 1:19:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1 .B. - Page 21 <br /> in the Caltrans right-of-way, and will have a separate Caltrans cover sheet. Consultant will fill out a <br /> Caltrans Encroachment Permit. It is expected Caltrans will require 8-10 weeks for plan review. The <br /> Ca!trans review package will be submitted separately and will be a separate plan series in the overall <br /> Joint Trench plan set. We assume three (3) Caltrans submittals prior to approval. District 4 Ca!trans will <br /> likely require the following forms to be completed as part of the Caltrans Encroachment Permit: Storm <br /> Water Data Report (SWDR), Preliminary Engineering Evaluation Report (PEER), Right-of-Way <br /> Certification, and Utility Certification. For all of these documents we assume they are the short-form <br /> versions with many boxes checked as"not applicable." <br /> OS5—SAN MATEO COUNTY JOINT TRENCH COMPOSITE DRAWINGS <br /> The City and County may enter into a separate agreement to add County composite drawing design <br /> services into this Agreement between Consultant and the City. Authorization of Task 0S5 to perform <br /> County design services will not commence until the separate agreement between County and City is <br /> approved by the City Engineer. The City/County agreement prepared by others will a) define the cost <br /> sharing for design services, b) method of payment from County to City, and c) may also address the cost <br /> sharing between County and City for construction. If Task 0S5 is activated,the scope of work will be to <br /> prepare the Composite Drawings for the San Mateo County joint trench located within San Mateo <br /> County Phase 3 MUUD Boundary, as shown on the Joint Trench Intent Drawing, dated September 2013, <br /> The level of detail and plans will be the same as described in basic services above. The fee for Task 0S5 <br /> assumes the NTP for this work occurs prior to Task 7A above. Plans prepared under Task 055 are <br /> assumed to be included in the same construction contract as the City MUUD 2011-01 Composite <br /> Drawings. <br /> • <br /> REV:02-24-15 VR <br /> Page 18 of 20 <br /> ATTYIAGR.2015.037Bellecci &Associates-Middlefield UUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.