My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Bellecci & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Bellecci & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 11:12:12 AM
Creation date
3/18/2015 12:34:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bellecci & Associates
PROJECT NAME
Civil Engineering for Middlefield Rd Underground Utility District - Joint Trench project
RMP File Number
304
Date
3/17/2015
MO Ref
15-029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT"A" <br /> SCOPE OF SERVICES <br /> Project Description <br /> The purpose af these design enginee�ing services is to prepare construction documents for joint trench <br /> undergrounding composifie drawings and the Joint Trench Form B for the Middlefield Road Underground <br /> Utility District (MUUD 2011-01). The (imits of work are as shown an the MUUD 2011-01 Boundary <br /> Description appraved by City CounciL The composite drawing's canduits and utility boxes/vaults wilf be <br /> based on the MUUD loint 7rench Intent Drawings,in conjunction with tt�e designs provided by the util'ity <br /> companies. Astaund, PG&E, Gomcast and RT&T. In addition,the project will include separate plans far <br /> the undergrounding a�f the electrical services to the existing street lights on the existing power poles. <br /> Services <br /> TASK 1—SUPPLEMENTA!FIEtQ SURVEYING <br /> Consultant wi[I perfarm field surveying to supplement the aerial tapography for the MUUD project <br /> flown in November 2011. The field surveying is to tie-i� more precise locations at the project conforms <br /> and at visible facilities or obstructions along the joint trench alignment. The surveying will be performed <br /> by a union journeyman fi�ld crew in two separate move-ins, using the same project survey control that <br /> was set for the ae�ial topagraphy, where passible. Field survey data will be processed by Consultant <br /> office surveyors under the directian of a licensed Iand surveyor and downloaded into AutoCAD 2Q13 for <br /> use by the engineers. <br /> Task 1a—Gravitv Inverts and Topa First Move-in:The first surveying move-in will be during the . <br /> 65% design period after the initial ob�tructions are identified. The items to be surveyed are facilities <br /> determined by the engineer to be in close proximity to the joint trench and/ar that have an impact on <br /> the joint trench plan and profile. Examples of surveyed facilities are water valves, power poles, (ight <br /> poles, drainage inlets, manholes, fire hydrants,fence lines, trees and ather items identified during the <br /> 65% design.Also key for the first survey move-in will be the surveying of the gravity sewer and storm <br /> drain line inverts. The inverts will infarm the designers for the profiling of the new joint trench vs the <br /> existing gravity lines. The inverts af the existing storm drain and sanitary will be surveyed at lacations in <br /> proximity to a joint trench crossing. This task wiil also include recard mapping updates on the side <br /> streets,to be requested from the City. <br /> Task 1b—Gravitv Inverts and Topo Second Move-in: A second move-in for field surveying <br /> wili be performed at the end of the 95%design to collect location of facilities obsenred in follow-up site <br /> walks and identified during 95% design period. The secand moye-in may also require follow-up for <br /> gravity lines inve�ts. <br /> TASK 2—FIElD SURVEYING OF PG&E SERVKF LATERALS <br /> Consultant wifl perform field surveying of the PG&E lateral markers at 120 private property service <br /> trenches. The services trenches are new conduits and termination cans to be installed by PG&E in <br /> Spring 2015, PG&E will be stubbing the joint trench conduits into a box or vault at the edge of the <br /> praperty, and this box will be the connection point between the MUUD project and the PG&E private <br /> praperty trenches. Consultant surveyors will tie-in the newly installed boxes, ff the private property <br /> trenches are not installed at the time of the City bidding of the MUUD project,then Consultant will use a <br /> portion of this budget to review the PG&E service trench plans and approximate the location of the <br /> service lateral stubs and vaults. <br /> REV:02-24-15 VR <br /> Page 10 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.