<br /> TASK 3—COMPOSITf CAD L4YOUT Of ALL UTIUTY 1T SKETCHES
<br /> Consultant will receive utility company conductor design sketches from Astound, RG&E, Comcast and
<br /> AT&T. These plans will be in various formats and scale$in PDF and hardcopy. Consultant will review the
<br /> utility company drawings to identify the number and size of conduits for each segment of the project,
<br /> along with the number,size and location for each vault. The various designs will be rectified betwQen
<br /> the utility companies to develop agreed upan locations for vaults,while meeting each utility company's
<br /> needs for access. Consultant will label each segment of joint trench (A,B, C, D etc)based on the trench
<br /> occupancy by various utility company conduits. Consultant will number each segment(1,2, 3 etc.)with
<br /> the same trench occupants.The composite layout wi0 include the number and size of conduits for each
<br /> utiGty company in each segment of trench. The plan will be completed in CAD an the project aerial
<br /> topographic survey base,and will be plotted at scale 1"=2Q'. This CAD layout will be prepared for rQView
<br /> of the utility companies.
<br /> Consultant will prepare a PG&E Standard Construction&LaborSummary sheet shawing key work items
<br /> to be performed by the City's Joint T�ench Contractor and work by each individual utility company.
<br /> These include items such as trenching (excavate, backfill & compact), RG&E electric transformer
<br /> enclosures, sidewalk enclosures, spfice baxes, conduits, wires, switchgears &transformers, cable tv
<br /> splice baxes,conduits,AT&T vaults,conduits,wires,street light conduits, boxes,street lights, (excavate,
<br /> supply&install),removal of poles,luminaire etc.
<br /> TASK 4—PREL1MlNARY FORM B/CONSTRUCTIDN COSF ESTIMATE
<br /> After campiling the various utility eompany plans into an initial CAD base file,Consultant will prepare an
<br /> initia)construetion cost estimate. The purpose of this task is to prepare a preliminary construction cost
<br /> estimate to supp(ement the construction cost estimate for electrieal work prepared by PG&E. PG&E's
<br /> cost estimate,expected to be complete in early Zp15, includes the costfor furnishing and pulling wires,
<br /> furnishing and installing transformers, installing other electrical equipment,trenching and installing the
<br /> panel conversionsjservice trenches, and removing pawer poles. Consultant will provide a cost estimate
<br /> for the work that will be depicted on the City's Joint Trench Composite Drawings, which are the
<br /> trenching & backfill, empty conduits, empty vaults, wet utility relocations, signal modifications,
<br /> temporary bulbouts, and surfaee restoratian. The Consultant cast estimate will be combined with the
<br /> PG&E estimate and will be compared with the assessment aliotment in the Rule 20A funds.
<br /> Since the estimate of the composite drawing improvements is being prepared before the plans are
<br /> prepared, Consultant will need to assume an average number of�anduits for each block of joint trench,
<br /> based on an initial review of the utility company plans. Consultant wiU assign an estimated cost to 4-6
<br /> levels of trench installation (example: level one— 1 to 2 conduits, level two— 2 to 4 conduits shallow,
<br /> level two— 2 to 4 c4nduits deep, etc). The length of conduits will be measured polylines in AutoCAD
<br /> with a percent increase to accaunt for sweeps. Vaults will be counted per the utility company plans. If
<br /> some of the utility company plans are incomplete Consultant will make assumptions for added conduits
<br /> and boxes to include in the estimate. The cost estimate is to be considered a planning-level cast
<br /> estimate with apprapriate contingencies,to assist with project phasing decision making.
<br /> TASK S—COORDlNATE COMPOSITE LAYOUT CHANGES WITH UTtL/TY COMPAN/ES
<br /> Consultant will present the composite layout in a meeting with the utility companies and deliver copies
<br /> to each utility company for their review and comment on the preliminary layout by consultant, Sir�ce
<br /> the preliminary composite layout will include adjustments in the original utility layout request by the
<br /> utility companies,the utilities will have an opportunity to review and comment on the combined layout.