i <br /> .... - �.--'----i - -- <br /> TASK 3—COMPOSITf CAD L4YOUT Of ALL UTIUTY 1T SKETCHES <br /> Consultant will receive utility company conductor design sketches from Astound, RG&E, Comcast and <br /> AT&T. These plans will be in various formats and scale$in PDF and hardcopy. Consultant will review the <br /> utility company drawings to identify the number and size of conduits for each segment of the project, <br /> along with the number,size and location for each vault. The various designs will be rectified betwQen <br /> the utility companies to develop agreed upan locations for vaults,while meeting each utility company's <br /> needs for access. Consultant will label each segment of joint trench (A,B, C, D etc)based on the trench <br /> occupancy by various utility company conduits. Consultant will number each segment(1,2, 3 etc.)with <br /> the same trench occupants.The composite layout wi0 include the number and size of conduits for each <br /> utiGty company in each segment of trench. The plan will be completed in CAD an the project aerial <br /> topographic survey base,and will be plotted at scale 1"=2Q'. This CAD layout will be prepared for rQView <br /> of the utility companies. <br /> Consultant will prepare a PG&E Standard Construction&LaborSummary sheet shawing key work items <br /> to be performed by the City's Joint T�ench Contractor and work by each individual utility company. <br /> These include items such as trenching (excavate, backfill & compact), RG&E electric transformer <br /> enclosures, sidewalk enclosures, spfice baxes, conduits, wires, switchgears &transformers, cable tv <br /> splice baxes,conduits,AT&T vaults,conduits,wires,street light conduits, boxes,street lights, (excavate, <br /> supply&install),removal of poles,luminaire etc. <br /> TASK 4—PREL1MlNARY FORM B/CONSTRUCTIDN COSF ESTIMATE <br /> After campiling the various utility eompany plans into an initial CAD base file,Consultant will prepare an <br /> initia)construetion cost estimate. The purpose of this task is to prepare a preliminary construction cost <br /> estimate to supp(ement the construction cost estimate for electrieal work prepared by PG&E. PG&E's <br /> cost estimate,expected to be complete in early Zp15, includes the costfor furnishing and pulling wires, <br /> furnishing and installing transformers, installing other electrical equipment,trenching and installing the <br /> panel conversionsjservice trenches, and removing pawer poles. Consultant will provide a cost estimate <br /> for the work that will be depicted on the City's Joint Trench Composite Drawings, which are the <br /> trenching & backfill, empty conduits, empty vaults, wet utility relocations, signal modifications, <br /> temporary bulbouts, and surfaee restoratian. The Consultant cast estimate will be combined with the <br /> PG&E estimate and will be compared with the assessment aliotment in the Rule 20A funds. <br /> Since the estimate of the composite drawing improvements is being prepared before the plans are <br /> prepared, Consultant will need to assume an average number of�anduits for each block of joint trench, <br /> based on an initial review of the utility company plans. Consultant wiU assign an estimated cost to 4-6 <br /> levels of trench installation (example: level one— 1 to 2 conduits, level two— 2 to 4 conduits shallow, <br /> level two— 2 to 4 c4nduits deep, etc). The length of conduits will be measured polylines in AutoCAD <br /> with a percent increase to accaunt for sweeps. Vaults will be counted per the utility company plans. If <br /> some of the utility company plans are incomplete Consultant will make assumptions for added conduits <br /> and boxes to include in the estimate. The cost estimate is to be considered a planning-level cast <br /> estimate with apprapriate contingencies,to assist with project phasing decision making. <br /> TASK S—COORDlNATE COMPOSITE LAYOUT CHANGES WITH UTtL/TY COMPAN/ES <br /> Consultant will present the composite layout in a meeting with the utility companies and deliver copies <br /> to each utility company for their review and comment on the preliminary layout by consultant, Sir�ce <br /> the preliminary composite layout will include adjustments in the original utility layout request by the <br /> utility companies,the utilities will have an opportunity to review and comment on the combined layout. <br /> REV:02-24-15 VR <br /> Page 11 of 20 <br /> ATTY/AGR.2015.03716ellecci&Associates-Middlefield UUD <br />