These utility company comments will be requested within 2 weeks af the utility meeting and distribution <br /> of the preliminary composite layout. Eight capies of the Composite Layout will be delivered to the City <br /> (3 for the City and ane for each utility company). <br /> TASK 6—RISER POLE LAYOUT AND C'DORDINATiON <br /> In conjunction with Task 4, Consultant will identify the locations of the new riser poles and guy wires <br /> based on the utility company utility plans and propose locations of the added poles in relation to the <br /> adjacent properties, treQS, driveways, sidewalk access and other adjacent property frontage <br /> cansiderations, 5ince these are new vertical features the new poles will be a sensitive issue for the <br /> adjacent properties. Consultant will notify utility companies of utility design �hanges necessary due to <br /> riser pole location constraints. The first move-in of surveying will collect key existing items related to <br /> the proposed added poles. <br /> TASK TA—65%JO/NT TRENCH PLANS <br /> After receiving comments fram the utility companies, the Consultant will update the plans and will <br /> prepare 65%Jaint Trench Composite Plans. The plan set will include the follawing series of sheets: <br /> Cove�Sheet <br /> Abbreviations&IVotes <br /> Overview Plan/Limits af UVark <br /> JointTrench Plan&Profile <br /> Joint Trench Enlargements <br /> loint Trench Conduit Sections end Tables <br /> Joint Trench Details(Vaults, Riser Poles,Trenches,Utility Crossings <br /> MCl/Verizon Relocation <br /> City Utility Modifications(sewer,water,storm) <br /> Surface Restoration Plans(temporary bulboutsj <br /> Surface Restoration Details <br /> Interim Street Light Plans <br /> Interim Street light Details <br /> Staging Plans—Work Sequence Requirements <br /> Traffic Handling Requirements <br /> Sediment and Erosian Contral Plans <br /> Specificatians <br /> Overview Plans/Limits of Work: The above plans wi(I be prepared with enough detaif to define the <br /> project alignment and costs, and to identify the modifications necessary to existing facilities. The <br /> overview plans will show the project limit of work per the approved MUUD Boundary from luly 2013 <br /> along with Iabels for Caltrans right-of-way. The Joint Trench on private properties has already been <br /> designed by PG&E and PG&E is taking the lead to install all of the conduits on private property under a <br /> separate construction contract, Therefore the limits af work for this MUUD Project end at the utility <br /> company conduit stubouts at the back of walk. The MUUD project trench design will connect to private <br /> property service conversion trenches by PG&E. The PG&E private service trenches are planned to be <br /> installed during the City MUUD design process. <br /> REV:02-24-15 VR <br /> Page 12 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />