Laserfiche WebLink
__ E <br /> TASK 22—CACTRANS COORDINAT/ON <br /> This task is for Caltrans coordination,to be performed an an Frourly basis for the level of effort depicted <br /> in the budget spreadsheet. Examples of services under this task include meetings with Caltrans staff <br /> and/or other correspondence with Caltrans. <br /> TASK 13—9596 PLANS,SFECIFICATIONS,ESTIMATE AND fORM B <br /> Consultant will update the plans, specifications,estimate and Form B following the receipt of comments <br /> from the City and utility companies. The 95%plans will include the jointtreneh details and utility profile <br /> labels, Also the 9596 specifications wiU include deletions and edits to standard technical speci�cations <br /> sections, and will add in the measurement and payment clauses. The Form B wiil be revised to match <br /> the 95% plans, alan�with the qua�titles and items updated an the 9596 cost estimate, The budget for <br /> this project assumes there are no significant changes by the utility companies or Gity after the 65% <br /> desi�n. <br /> The 95% su6mittal will be 7 half-size sets of plans, 3 full-size sets of plans, 10 specifications, 1U cost <br /> estimates,and 10 Form Bs. Submittal will also include PDF copies of all documents. <br /> TASK 14—QUAUTY CQNTROL PLAN REVIEW <br /> Consultant will retain outside licensed engineer �defined as a qualified engineer who is not part of the <br /> design team)to review the plans,speei�cations and estimate. Outside plan checker will meet with the <br /> design team to review comments. Comments from the outside reviewer will be incorporated into the <br /> plan set. <br /> TASK IS—100%PLANS,SPECIfICATlQNS,ESTIMATFAND FORM 8 <br /> Consuftant will update the plans, specifications, estimate and Form B to include comments from the <br /> City, utility companies, and revisions from the outside plan reuiew. The 100%submittal will be 7 half- <br /> size sets of plans, 3 full-size sets of plans, 10 specifications, 10 cost esfiimates, and 10 Form Bs. <br /> Submittal will also include PDF copies and source files of all documents. <br /> TASK 26—B1D PlANS,SPfCIFlCAT1DNS,ESTIMATE AND FORM B <br /> Consultant will update the plsns,specif'rcations,estimate and Form e to i�clude comments from the City <br /> and utility companies. The bid submittal will be one set of electronic files and one signed hard copy plan <br /> set. <br /> TASK 17—LEAD RfGULAR MEET/NGS WITH UT/IITY COMPAN/ES <br /> Consultant will attend meetings throughout the design phase with utility company representatives, <br /> similar to the MUUD meetings held between October 2Q13 and July 2014. Cansultant will prepare the <br /> meeting agenda and will lead the discussion. City wiU send out meeting announcements and prepare <br /> the meeting minutes. Consultant will use the meetings ta present composite design plans and to <br /> coordinate questions with the utility companies. This task has 8 meetings budgeted. <br /> TASK 18—LEG�41 DESCRIPTfONS <br /> MUUD project may require legal descriptions for joint trench improvements on private property. The <br /> legal description will be a plat map and metes and bounds description (or a strip description as <br /> appropriate). Both the plat map and legal description will be stamped by a California-licensed Land <br /> Surveyor. The legal descriptions will follow PG&E requirements per the current"PRIVATE SECTOR LAND <br /> SURVEYORS CHECK LIST:' City wifl provide title reports for subject properties. Field surveyors will tie-in <br /> REV:02-24-15 VR <br /> Page 16 of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />