My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Bellecci & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Bellecci & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 11:12:12 AM
Creation date
3/18/2015 12:34:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bellecci & Associates
PROJECT NAME
Civil Engineering for Middlefield Rd Underground Utility District - Joint Trench project
RMP File Number
304
Date
3/17/2015
MO Ref
15-029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
corners andjor monuments as referred to on the title report to create the legal description. This task <br /> has an allowance for 3 legal descriptions. <br /> TASK 29—SO/LERPLATE AMD SPEC/AL PROVISIONS <br /> In addition ta the technical specifications, Consultant will assist City with the boilerplate specifications <br /> and the special provisions. This task will include making the first pass at editing the City standard <br /> boilerplate specifications and the special pravisions with project-specific information. Many of the <br /> items will require discussion and coordination wifh City staff for administrative requirements inciuded in <br /> the contract documents. City will prepare the final version of the boiCerplate speci�catians and the <br /> speciaf provisions prior to advertising the projec�. <br /> TASK 20—PROGRAM SCHEDUtING <br /> Design Team wiil maintain a master schedule of the various projects and phases related ta the MUUD <br /> project: City MUUD design, PG&E service trenches, Gty MUUD contractor,City streetscape desig� and <br /> constructiQn,Citystreet lights,utility companies pull wires&energize,and power pole removal. <br /> OPTIONAL SERVICES(OS) <br /> Listed below are services nat included in the basic contract work but may be added upon written <br /> authorization from the City Engineer: <br /> QSI�PDTHOtINCs <br /> Consultant will retain a potholing contractor ta expose existing utilities at select locations. Potholing <br /> contractor wiU follo�+v City requirements for working haurs and submit traffic control plans to the City for <br /> approval prior to any lane ciosures an public streets, The pothaling contractar will mark a set of plans to <br /> indicate depth, diameter and location of existing pipe. Budget included in this proposal assumes 15 <br /> pothales. <br /> OS2—SWPPP <br /> Prepare a Storm Water Poliution Prevention Plan (SWPPP) by a Qualified SWPRP Developer {qSD) in <br /> conformance with California 5tate Water Resource Control Board's Construction General Permit (CGP). <br /> SWPPP will be prepared per the CASt1A Template and will be uploaded to the State's SMARTS System <br /> website. The City wili provide information regarding Legally Responsible Person (LRP) and Approved <br /> Signatory (AS) for the project. Consultant will calculate the Risk Level based on the praject type.This <br /> task does not include QSD and Qualified SWPPP Practitioner (QSP) services after uploading of the <br /> SWPPP to the SMARTS System. QSD and QSP services during construction wiU be part of a separate <br /> agreement.The City will be respansible for paying the fees associated wi#h the C�P and submitting to <br /> the State Water Board. Const�uction may not begin until a WDID number has been is$ued by the State <br /> Water Board. <br /> OS3—5/GNAL MOD/f1CAT10NS <br /> MUUD project may require modifications to si�nals at various locations due ta disruption of detector <br /> laaps, and/or requirements for pedestrian push buttons due to the relocation of curb ramps at <br /> temporary bulbouts. The following intersections to be checked for signal conflicts inGlude: Map1e, <br /> Chestnut,Woodside,Willow,Charter and Dauglas. <br /> OS4—CALTRANS SUBMITTALS <br /> Shortly after the 65%submittal, Consultant will prepare a "100% Permit Submittal" for Caltrans review. <br /> The 100% permit submittal will be limited to the segment of joint trench across Woodside Road which is <br /> REV:02-24-15 VR <br /> Page il of 20 <br /> ATTY/AGR.2015.037/Bellecci&Associates-Middlefield UUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.