My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Bellecci & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Bellecci & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 11:12:12 AM
Creation date
3/18/2015 12:34:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bellecci & Associates
PROJECT NAME
Civil Engineering for Middlefield Rd Underground Utility District - Joint Trench project
RMP File Number
304
Date
3/17/2015
MO Ref
15-029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
in the Caltrans right-of-way, and will have a separate Caitrans cover sheet. Consultant will fill out a <br /> Caltrans Encroachment Permit. It is expected Caltrans will require 8-1Q weeks for plan review. The <br /> Caltrans review package will be submitted separately and will be a separate plan series in the overall <br /> Joint Trench plan set. We assume three(3)Caltrans submittals prior to approval. District 4 Caltrans wili <br /> likely require the following forms to be completed as part of the Caltrans Encroachment Permit: Storm <br /> Water Data Report (SWDR), Preliminary E��ineering Evaluation Report (PEfR), Right-of-Way <br /> Certification, and Utility Certi�ication. For all of these documents we assume they are the short-form <br /> versions with many boxes checked as"not applicable." <br /> OSS—SAN'ARATEO COUNTYIO/NT TRENCH COMPOS/TE DRAW/NGS <br /> The City and County may enter into a separate agreement to add County composite drawing design <br /> services into this Agreement between Consultant and the City. Authoritation of Task OSS to perform <br /> County design seruices will no# comme�ce until the separate agreement between County and City is <br /> approved by the City Engineer. The City/County agreement prepared by others will a} define the cost <br /> sharing for design services, b)method of payment from County to City,and c)may also address the cost <br /> sharing between County and City for canstructi'ron. If Task OS5 is activated,the scope of vuark will be to <br /> prepare the Composite Drawings for the San Mateo County joint trench located within San Mateo <br /> County Phase 3 MUUD Baundary,as shown on the Joint Trench Intent Drawin�,dated September 2013. <br /> The level of detaif and plans will be the same as described in basic services above, The fee#or Task OSS <br /> assumes the NTP for this work occurs prior to Task 7A above. Plans prepared ander Task DS5 are <br /> assumed to be included in the same construction contract as the Lity MUUD 2011-01 Composite <br /> Drawings. <br /> REV:02-24-15 VR <br /> Page 18 of ZO <br /> ATTY/AGR.2015.037/6ellecci&Associates-Middlefield UUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.