Laserfiche WebLink
8.A. - Page 102 <br /> Exhibit B. Engineering and Construction Requirements <br /> 3.5.15 Wiring and Cabling Runs 13 <br /> 3.5.16 Grounding and Bonding 15 <br /> 3.5.17 System Security Requirements 15 <br /> 3.5.18 Shade Structure Lighting 15 <br /> 3.5.19 Monitoring System, DAS, and Reporting 16 <br /> 3.5.20 FAA Requirements 17 <br /> 3.5.21 Interconnection 18 <br /> 3.5.22 Production Modeling 18 <br /> 3.5.23 Shading 18 <br /> 3.6 Warranties.. 19 <br /> 4. Procurement/Construction 20 <br /> 4.1 Scope of Supply .. 20 <br /> 4.2 Materials and Equipment 20 <br /> 4.3 Line Location 20 <br /> 4.4 Quality Assurance and Quality Control 20 <br /> 4.5 Removal and Remediation 21 <br /> 5. Testing 21 <br /> 5.1 Acceptance Testing 22 <br /> 52 System Startup 23 <br /> 55.33 Proving Period (30 days) 23 <br /> 5.4 CLOSE-OUT DOCUMENTATION REQUIREMENTS 25 <br /> 6. Operations and Maintenance 25 <br /> 6.1 Preventive Maintenance 25 <br /> 6.2 Troubleshooting, Inspection and Additional Repairs 27 <br /> 6.3 Customer Service Support 27 <br /> 6.4 Maior Component Maintenance and Repair 27 <br /> 6.5 Other System Services 28 <br /> 7. Production Guarantee 28 <br /> 8. Training 28 <br />