My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-03-23 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-03-23 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 9:22:13 AM
Creation date
3/19/2015 4:55:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/23/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 123 <br /> Exhibit B. Engineering and Construction Requirements <br /> • String-level voltage (open circuit) and amperage (under load) testing for all PV strings. <br /> Amperage testing shall be performed concurrently with irradiance testing. <br /> • Inverter testing for all inverters.The inverters shall be commissioned on-site by a qualified <br /> technician and shall confirm that the inverter can be operated locally per specification <br /> and that automatic operations such as wake-up and sleep routines, power tracking and <br /> fault detection responses occur as specified. Performance testing shall be performed <br /> concurrently with irradiance testing. <br /> • Testing of all sensors of the DAS. <br /> • Testing of the Data Presentation interface of the DAS. <br /> After Seller conducts all Acceptance Testing based on the Testing Plan, Seller shall submit a <br /> detailed Acceptance Test Report to the Buyer for review. <br /> The Acceptance Test Report shall document the results of the tests conducted following the <br /> Testing Plan, and include additional information such as the date and time each test was <br /> performed. It shall also make reference to any problem and deficiencies found during testing. If <br /> there was troubleshooting done, the Report shall describe the troubleshooting methods and <br /> strategy. Seller shall be responsible for providing the labor and equipment necessary to <br /> troubleshoot the System. <br /> 5.2 System Startup <br /> Following Buyer approval of the Acceptance Test Report, Seller shall conduct tests over twenty- <br /> four (24) hours and at a time resolution of fifteen (15) minutes, recording the following data: <br /> • Average AC output (kW) <br /> • Average DC output(kW) <br /> • Hourly PV system production (kWh) <br /> • AC and DC voltage <br /> • In-plane irradiance <br /> • Ambient and cell temperature <br /> • Inverter status flags and general system status information <br /> These data points shall be presented in a manner that best depicts the actual performance of the <br /> system for Buyer review and approval and shall be submitted as part of the Startup Test Report. <br /> 5.3 Proving Period (30 days) <br /> Upon completion of Acceptance Testing and System Startup, Seller shall monitor the system <br /> during a thirty (30) day Proving Period and submit a report for Buyer review. This includes <br /> monitoring system output and ensuring the correct functioning of system components over this <br /> time. The values for the following data shall be acquired every fifteen (15) minutes over thirty <br /> Exhibit B Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.