My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-03-23 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-03-23 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 9:22:13 AM
Creation date
3/19/2015 4:55:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/23/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 124 <br /> Exhibit B. Engineering and Construction Requirements <br /> (30) days: <br /> • AC system output (kW) <br /> • PV system production (kWh) <br /> • AC and DC voltage <br /> • In-plane irradiance <br /> • Ambient and cell temperature <br /> • Inverter status flags and general system status information <br /> • System availability <br /> Seller shall utilize calibrated test instruments and the DAS and monitoring system to collect the <br /> test data described above,which shall be made available to the Buyer for access throughout the <br /> Proving Period. Seller shall determine through analysis of data from the Proving Period whether <br /> the PV system delivers the expected production as determined by the final approved design (i.e., <br /> Construction Documents). Actual production shall be compared against expected production <br /> using actual weather data and other system inputs (such as module cell temperature factor, <br /> module mismatch, inverter efficiency, and wiring losses) for calculating expected production. <br /> The production figures for all meters, whether existing or installed by or on behalf of the IOU or <br /> by or on behalf of the Respondent, shall be correlated during this test to verify their accuracy in <br /> measuring system production. <br /> All data and reports required in Section 3.5.20 shall be fully functional and available to the Buyer <br /> at the commencement of the Proving Period. Data and reporting requirements are included in <br /> the testing scope of the Proving Period. <br /> If the PV system does not perform to design specifications, diagnostic testing shall be performed <br /> by Seller,deficiencies shall be identified with proposed corrective actions submitted to the Buyer. <br /> Seller shall be responsible for providing the labor and equipment necessary to troubleshoot the <br /> system. <br /> At the end of the Proving Period, Seller will provide notice to Buyer confirming that the system <br /> is operating as designed and in compliance with this Exhibit. <br /> 5.4 CLOSE-OUT DOCUMENTATION REQUIREMENTS <br /> Close-Out documents prepared by Seller must include at minimum, but not limited to, the <br /> following items: <br /> • Final As-Built Drawing Set with accurate string diagram and estimated Year 1 monthly <br /> production <br /> • Megger test Results <br /> • Module flash-test results with serial numbers <br /> • Component warranties <br /> • Signed inspections cards from AHJ and required Special Inspections <br /> Exhibit B Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.