My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-03-23 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-03-23 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 9:22:13 AM
Creation date
3/19/2015 4:55:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/23/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 9 <br /> EXHIBIT A <br /> PUMP REPAIR SERVICE CO. <br /> November 29, 2014 <br /> City of Redwood City <br /> 1400 Broadway <br /> Redwood City,CA 94063 <br /> Attn: Elliott S.Johnson <br /> SUBJECT: SEAPORT CENTRE STORM WATER STATION 42-INCH DISCHARGE <br /> HEADER REPLACEMENT <br /> Scope of Work <br /> Remove Existing 42-Inch DischargeHeaderManifold Fabricate <br /> and Install New Discharge Pipe Manifold <br /> 1 —29 Ft. 42" sch 20 mitered pipe <br /> 1 —42" 150# Flange <br /> 1 —42" Gasket/bolt up kit <br /> 3 —30" sch 20 coped pipe branches <br /> 3 —30" 150#flanges <br /> 3—30" Gasket/bolt up kits <br /> 3—30" sch 40 flanged branches <br /> 1 —20" 150#flanges <br /> 1 — 10" sch 40 45-degree elbow <br /> 2 — 10" Gasket/bolt up kits <br /> 1 —Coating/lining Wasser MC-zinc, epoxy <br /> 1 —42" inflatable pipe plug <br /> Freight <br /> Sales Tax <br /> 1 —3-person dive crew with one working diver <br /> Per Day: 1-2 days to prepare the interior of the discharge pipe, insert the pipe plug and <br /> over-sleeve, inflate the plug and monitor its deployment (maintain stable working pressure) <br /> 1 day to deflate the pipe plug, clean interior end of the pipe, and extract the plug pipe with <br /> over-sleeve and air supply hose <br /> 1 — 15 HP 6" temporary pump and hoses <br /> 1 — Field labor <br /> 1 —Crane and rigging <br /> 1 —Boom truck/service truck <br /> 1 — Disposal of old equipment <br /> Total $187,250.00 <br /> ESTABLISHED 1941 <br /> PO BOX 34327 SAN FRANCISCO,CA 941340327 415467215) FAX 415.467.7442 <br /> www.pumprepairservice.com <br /> REV:03-02-15 MLG <br /> Page 6 of 6 <br /> ATTY/AGR.2015.041/Pump Repair Service Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.