My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-03-23 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-03-23 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 9:22:13 AM
Creation date
3/19/2015 4:55:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/23/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 10 Attachment A— Proposed Work Plan [Exhibit A] <br /> Scope of Work <br /> 1. Removal of the existing 42-in discharge header manifold which includes the following: <br /> • Three (3) 30-inch pipes <br /> • Three (3) 30-inch 45 degree elbows <br /> • One (1) 10-inch pipe <br /> 2. Fabrication and installation of a new discharge pipe manifold which includes the following: <br /> • Three (3) 30-inch pipes <br /> • Three (3) 30-inch 45 degree elbows <br /> • One (1) 10-inch pipe <br /> 3. Installation of a 42-in pipe plug to isolate the pump station <br /> 4. New istallation must be Epoxy coated in the interior and exterior surfaces of the pipes <br /> 5. Provide means to keep the pump station dewatered <br /> 6. Provide the required equipment, supplies, parts, and materials to perform the work <br /> 7. Coordinate work with assigned City Staff <br /> Status Report <br /> The contractor is required to provide City Staff with weekly status report. Status report should be <br /> submitted via email to ejohnson @redwoodcity.org by closing of business day each Monday. The <br /> status report should include: <br /> 1. Tasks completed <br /> 2. Cost summary <br /> 3. Issues <br /> 4. Schedule update <br /> 5. Priorities for the coming week <br /> Working Day <br /> The Contractor's working day activities shall be limited to the hours between 7:00 a.m., and 4:00 <br /> p.m., Monday through Friday. Deviation from normal working hours will not be allowed without <br /> approval from the City. <br /> 1 <br />