Laserfiche WebLink
Legend. Applicant = project applicant, City = City of Redwood City <br />Page 19 May 18, 2004 WP9.016451MMCHT.645 <br />MOI ­ ORING <br />VERIFICA 0ON <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />AM and PM peak hours. The change in the <br />Alternatively, install a traffic signal at the <br />average delay at the intersection due to the <br />intersection. With signalization, the <br />project is expected to be more than 5.0 <br />intersection is expected to operate at LOS B <br />seconds. The intersection is also expected to <br />during the AM and PM peak hours under <br />satisfy the Caltrans Peak Hour Volume <br />Project Conditions. <br />Warrant for traffic signal installation during <br />both the AM and PM peak hours under Project <br />Or, as a third alternative, install a <br />Conditions. These secondary effects of <br />roundabout at the intersection. With the <br />Mitigation 7 -10, the Blomquist Street <br />roundabout, the intersection would operate <br />Extension, would represent a significant <br />at LOS A during the AM and PM peak hours <br />secondary impact. <br />under Project Conditions. <br />Implementation of one of these secondary <br />mitigation alternatives to City satisfaction <br />would be a project responsibility. <br />Implementation of any one of these three <br />mitigation alternatives would reduce the <br />project's secondary impact at the Blomquist <br />Street/Maple Street intersection to a less - <br />than- significant level. <br />Impact 7 -11: Project Impacts on C /CAG's <br />Mitigation 7 -11. Based on the C /CAG <br />Applicant/ <br />Implement TDM <br />City <br />Formulate <br />Congestion Management Plan (CMP) <br />requirements, and as required under <br />City <br />program (incl. <br />program prior to <br />Roadway Network —PM Peak Hour. The <br />Mitigation 7 -2 herein, the project sponsor <br />annual report). <br />tentative map, <br />proposed project (Alternative 6) is expected to <br />shall implement and maintain a <br />development <br />generate 909 net new peak -hour trips during <br />transportation demand management (TDM) <br />agreement <br />the PM peak hour. Because the project trip <br />program that meets the requirements <br />approval; annual <br />generation rate is more than 100 net new <br />presented in the C /CAG Guidelines for the <br />City review of <br />peak -hour trips and the project is subject to <br />Implementation of the Land Use Component <br />TDM program <br />CEQA review, the proposed project must <br />of the 1999 Congestion Management <br />annual report <br />meet the requirements presented in the <br />Program in order to reduce the number of <br />continuing for <br />C /CAG Guidelines for the Implementation of <br />trips on the CMP roadway network. The <br />five years after <br />the Land Use Component of the 1999 <br />TDM program, to be developed by the <br />full project <br />Congestion Management Program. Until the <br />project sponsor, must be approved by both <br />buildout <br />project meets these requirements to C /CAG <br />the City of Redwood City and C /CAG prior <br />satisfaction, the project's potential effects on <br />to City approval of any tentative subdivision <br />C /CAG's CMP roadway network in the PM <br />map or development agreement for the <br />peak hours are considered to be significant. <br />proposed project. Implementation of this <br />measure would reduce the impact to a less - <br />than- significant level. <br />Impact 7 -12: Project Driveway Safety <br />Mitigation 7 -12. The following guidelines <br />Applicant <br />Design and <br />City <br />Design prior to <br />Impacts. If not properly aligned and <br />shall be followed in finalizing project access <br />construct identified <br />Precise Plan <br />accompanied by sight line obstruction controls <br />details: <br />driveway <br />approval; <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 19 May 18, 2004 WP9.016451MMCHT.645 <br />