My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2004
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:17:40 PM
Creation date
6/9/2004 2:12:37 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Legend. Applicant = project applicant, City = City of Redwood City <br />Page 43 May 18, 2004 WP9.016451MMCHT.645 <br />MON.. JRING <br />VERIFICP,. ON <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />(such as temperature, humidity, and <br />wind speed). Specific chemical inputs <br />proposed for application to vegetation <br />shall be among those tested and <br />cleared by the USEPA. Frequency and <br />scheduling of these chemical inputs <br />also shall be indicated based on site - <br />specific characteristics (such as soil <br />and vegetative cover and rates of <br />uptake) and the acknowledged <br />sensitivity of downstream receiving <br />waters. <br />Implementation of these measures would <br />reduce the water quality impacts to a less - <br />than- significant level. <br />Impact 9 -3: Temporary Impacts from <br />Mitigation 9 -3. Require the following <br />Applicant <br />Implement <br />City <br />See below: <br />Proposed Flushing Channel Construction <br />mitigation measures to reduce water quality <br />identified measures <br />(Dredging) and Marina Filling Operations. <br />impacts associated with proposed project <br />to reduce water <br />Dredging of the flushing channel and the initial <br />flushing channel dredging and marina filling <br />quality impacts of <br />installation of sheet piling to facilitate partial <br />operations: <br />dredging and filling. <br />filling of Peninsula Marina and Pete's Inner <br />Harbor would disturb marina bottom <br />As a condition of project approval, <br />Prior to <br />sediments and would create temporary water <br />require the applicant to apply to the <br />Precise <br />quality impacts, resulting in a potentially <br />U.S. Corps of Engineers (Corps) for an <br />Plan <br />significant impact. <br />Individual Department of Army Fill <br />adoption <br />Permit, and abide by any conditions <br />imposed by the Corps and its sister <br />agencies of the Dredged Materials <br />Management Office (DMMO) pertaining <br />to the disposal of dredged sediments. <br />Contract with a water quality and <br />Prior to <br />sediment testing laboratory certified by <br />grading <br />the State of California to conduct an <br />permit <br />updated testing of marina and flushing <br />issuance <br />channel sediments. Flushing channel <br />sediments will have to be drawn as <br />core logs during a pre - project, pre - <br />excavation testing program. Results of <br />the updated testing shall be submitted <br />along with the Department of Army <br />Permit application to the Corps, the Fill <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 43 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.