Laserfiche WebLink
Redwood City I-Net Cost Estimate OPTION C-6 Fibers on a Separate Cable <br /> Prepared by RCN-TNDG Engineering <br /> Revised 07//25/00 <br /> Existing Cable Run <br /> Cable Cable Aerial Material Const. U.G. Materiai Const. Est.#of Indiv. Totai <br /> Size Type Footage Cost Cost Footage Cost Cost FiberSplices Cost <br /> LIBRARY TO 2600 MIDDlEF1ELD RD. 24 Fiber Single Mode 3,483 54,180 $5,225 106 $127 $1,060 192 $10,591 <br /> 2800 Middlefield to 901 Bay Rd. 12 Fiber Single Mode 2,783 31,670 $4,175 0 $0 5U <br /> 12 $S,Bd4 <br /> library to 2190 Jefferson Ave. 24 Fiber Single Mode 7,244 $8,693 $10,886 900 $1,080 59,000 128 $29,639 <br /> �Z $20,530 <br /> 2190 Jefferson Ave.to 3700 Highland Ave. 12 Fiber Single Mode 9,776 $5,866 $14,664 0 $0 $0 ,Z $9 7� <br /> 2190 Jefferson Ave.to 1120 Roosevelt Ave. 12 Fiber Single Mode 4,640 32,784 56,960 0 $� $o Total 576�348 �.�- <br /> � �Non-Exis6ng Cable Run �, <br /> Cable Cable Aerial Material Const. U.G. Material Const. Est.#of Indiv. TMaI <br /> Size Type Footage Cost Cost Footage Cost Cost FiberSplices Cost � ` <br /> LIBRARY TO 2600 MIDDLEFIELD RD. 24 Fiber Single Mode 424 5509 $636 1,177 $1,412 $35,310 0 $37,867 <br /> 2600 Middlefield to 901 Bay Rd. 12 Fiber Single Mode 4,440 $2,664 $6,66� o $0 $0 0 39,324 <br /> Library to 2190 Jefferson Ave. 24 Fiber Single Mode 300 $360 $450 900 $1,080 $27,000 � $28�890 <br /> 0 $1,260 O <br /> 2190 Jefferson Ave.to 3700 Highland Ave. 12 Fiber Single Mode 600 $360 $900 � $� $� Q $2,965 <br /> 2190 Jefferson Ave.to 1120 Roosevelt Ave. 12 Fiber Single Mode 1,412 $�� $Z�118 � $0 $� To�� $g0,3a6 ��. � � <br /> Z <br /> Splicing(Per Fiber Run) $14,514 � <br /> Tertnination Cost(Per Fiber Run) $4��� <br /> Engineering/Design/Testing $15,000 <br /> Testing/Documentation($100'48 fibers) $4�8� <br /> 'fOfal Estimat8d Cosi �'194,988 <br /> Notes: <br /> 1.Cable sizes and point to point requirements were developed from infortna6on provided by the ciry. `� <br /> 2.Aerial ConsUudion cost of$1.50/R was used. <br /> 3.A Pro-raled underground colocated construdion cost of$10/ft,and$30/ft for noncolocated underground construction was used. <br /> 4.A fiber termination cost of$BOOAocation was used for I-Net premise tertnination. <br /> 5.No electronics are included in the above estimate. <br />� 6.A testing/documentation charge of$100lfiber was used. <br /> 7.Engineering/Design/Project managemeni charge was derived from 200 hrs @$75/hr <br /> 8.A splicing charge of$41/fiber was used. <br /> 9. Actual cost to construct will vary depending if RCN has already established right of way or placed cables at time of cily cable placement. <br /> 10.No make ready,sVand placement,pertnitting or pole attachment costs are included in this estimate. <br /> 11.A 20°�multiplier factor was added to cable quantities to account for slack and expansion loops and vertical riser runs. <br /> 12.This estimate is a revised version of an original estimate prepared on 03/23/2000. <br /> 13.This estimate is based on revised requirement information provided by the city on 06/22/2000 <br /> 14.Actual cost of I-Net nelwork could vary from estimate depending on the material/labor costs and conditions at the time of construction. <br /> 15.250 ft.of cable needed to gain access to the I-Net <br /> �e <br />