Redwood City I-Net Cost Estimate OPTION B-4 Dedicated Fibers for each City Building <br /> Prepared by RCN-TNDG Engineering <br /> Revised 7-26-00 <br /> Shared RCN Fiber <br /> Fjbers Cable Aerial Material Const. U.G. Material Const. Est#of Indiv. Total <br /> Used Type Footage Cost Cost Footage Cost Cost Fiber Splices Cost <br /> Library to P.Nt2300(Segment t) 8 Single Mode 8,624 $5,299 36,624 835 $508 $4,233 48 $18,665 <br /> P.NT 2300 to 2600 Middlefield(Seg 1A) 4 Single Mode 3,077 $1,231 $1,539 0 Sa $� �2 $Z'�89 <br /> P.NT 2300 to 901 Bay Rd.(Seg 1B) 4 Single Mode 4,618 $1,847 $2,309 0 $0 $0 tz �•�� <br /> Librery to 2190 Jefferson Ave.(Seg 2) 12 Single Mode 5,703 $6,844 $8,555 680 $816 $8,800 80 $23,014 <br /> 2190 Jefferson Ave.to 3700 Highland Ave.(Seg 2A) 4 Single Mode 8,146 $3,258 $4,073 0 $0 $0 S $7,331 :. <br /> 18 $3.479 � <br /> 2190 Jefferson Ave.to 1120 Roosevelt Ave.(Seg 2B) 4 Single Mode 3,868 $1,548 $1,933 0 $� $� To�y� ', $57,4'15��.��.� <br /> Non-F�cisfing Cable � <br /> Fibers Cable Aerial Material Const. U.G. Material Const. Est.!f of Indiv. Total <br /> Used Type Foolage Cost Cost Pootage Cost Cost Piber Spiices Cost , <br /> Librery to P.Nt2300(Segment t) S Single Mode 0 $0 $0 900 $1,080 327,000 0 $28,080 <br /> P.NT 2300 to 2600 Middlefield(Seg 1A) 4 Single Mode 1,334 $1,607 $2,001 0 $0 $0 0 53,802 <br /> P.NT 2300 to 901 Bay Rd.(Seg 1 B) 4 Single Mode 482 $289 $723 0 $0 $0 0 51,012 � <br /> Library to 2190 Jefferson Ave.(Seg 2) 12 Single Mode 250 $300 $375 650 $780 $3,250 0 $4,705 <br /> 2190 Jefferson Ave.to 3700 Highland Ave.(Seg 2A) 4 Single Mode 250 $150 $375 0 $0 $0 <br /> 0 $525 <br /> 2190 Jefferson Ave.to 1120 Roosevelt Ave.(Seg 2B) 12 Single Mode 928 $556 $1,389 0 $0 $0 0 31,945 <br /> Total ''$39;889�.�...�. <br /> � <br /> Splicing(Per Fiber Run) �•3� � <br /> Fiber Terminatlon Cost(Per I-Net Location) ���� Q � <br /> EngineeringlDesignlfesling $11250 Z <br /> Testing/Dowmentation($100'20 fibew) $2��� W <br /> rois�e��a�a eos� s�zo,��s <br /> Noter. <br /> 1.Cable sizes and point to point requirements were developed from information provided by the ciry. <br /> 2.Aerial ConsUuction cost of$1.50lft was used. <br /> 3.A Pro-rated underground colocated consWction cost of$10lft,and$30/Rfor noncolocated underground construc[ion was used. �� <br /> 4.A fiber tertnination cost of$800/location was used for I-Net premise tertninatlon. <br /> 5.No electronics are inGuded in the above estimate. <br /> 6.A testing/documentation charge of$100/fiber was used. <br /> 7.Engineering/Design/Project management charge was derived from 150 hrs�$75/hr <br /> 8.A splicing charge of$41/fiber was used. <br /> 9. Actual cost to construct will vary depending if RCN has already established right of way or placed cables at time of city cable placement. <br /> 10.No make ready,strand placement,permitting or pole attachment costs are included in this estimate. <br /> 11.A 20°h multiplier factor was added to cable quantities to account for slack and expansion loops and vertical riser runs. <br /> 12.This estimate is a revised version of an original estimate prepared on 03/23/2000. <br /> 13.This estimale is based on revised requirement infortnation provided by the city on 06/22/2000 <br /> 14.Actual cost of I-Net nehvoric could vary from estimate depending on the materialAabor costs and conditions at the time of construction. <br /> 15.250 ft.of cable needed to gain access to the I-Net <br />