7.1.D. - Page 10 <br /> merit, handling and disposition of Contractor's claims. Except in the event that <br /> the CM is alleged to have caused or contributed to the circumstances giving <br /> rise to a Contractor claim or other Contractor demand for compensation, <br /> services of the CM to prepare documentation or provide testimony in a <br /> mediation, arbitration or judicial proceeding arising out of such a claim or <br /> demand for compensation shall be deemed additional services. If the CM is <br /> alleged to have caused or contributed to a Contractor claim, the CM's claims <br /> handling services, including without limitation, claims analysis, assistance in <br /> preparing briefs/graphic materials in connection with negotiations or dispute <br /> resolution proceeding relating to a Contractor claim shall be deemed part of <br /> the CM's basic services under this agreement. <br /> 8. CM equipment, CM shall provide the following equipment necessary to carry out CM <br /> duties: <br /> a. Provide all equipment, furnishings and other items necessary to complete the <br /> services required for the project. Including without limitation, computers, <br /> related hardware, software, vehicles, cell phones, office equipment and <br /> copiers. <br /> Task 4c—Post-Construction Phase—work shall include but is not limited to the following: <br /> 1. Contractor closeout document review, CM services shall include but are not limited to <br /> the following: <br /> a. Receive from the Contractor the closeout documents and items to be <br /> submitted by the Contractor under the terms of the Construction Contract <br /> upon completion of its obligations under the Construction Contract. The CM <br /> shall review each Contractor's closeout submittals to determine conformity <br /> with the requirements of the Construction Contract. If the CM determines that <br /> any Contractor's closeout submittals are not in conformity with requirements of <br /> the construction contract,the CM shall make recommendations to the CITY for <br /> measures to secure compliance with the requirements of the construction <br /> contract. The CM shall deliver to the CITY all of the Contractor's closeout <br /> submittals, including the Contractor's as-build drawings which the CM shall <br /> transmit to the design consultant for preparation of the record drawings. The <br /> CM shall monitor the design consultant's preparation and completion of the <br /> project record drawings prior to delivering to the CITY. <br /> b. Within thirty (30) days of the date of issuance of a Certificate of Final <br /> Completion for the construction contract, the CM shall assemble and deliver to <br /> the CITY all of the records maintained by the CM relating to the project. <br /> Task 4d—Allowance for Testing and Inspections by Subconsultant <br /> 1. CM shall engage the necessary subconsultants to perform the necessary testing and <br /> inspection as required for the project. CM shall schedule and coordinate with the <br /> contractor and subconsultant for the necessary testing and inspection for the project. <br /> 2. Compensation to the CM for testing and inspections by subconsultant shall be for the <br /> actual billed amount for these subcontracted services. CM shall bill monthly for actual <br /> testing and inspections completed. CM shall attach copies of subconsultants' invoice <br /> for verification of cost being billed. <br /> REV:0406-15 MLG <br /> Page 8of10 <br /> ATTY/AGR.Amend No. 1iGilbane Building Company <br />