My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-05-04 Closed Interview and Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-05-04 Closed Interview and Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:07:37 PM
Creation date
4/30/2015 1:11:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/4/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 9 <br /> In the event a conflict exists between the Improvement Plans and the requirements of Chapter 30 of the <br /> Redwood City Code, the stricter requirement or standard shall govern, as reasonably determined by the <br /> City Engineer. <br /> 4. Completion Date. <br /> 4 J. Developer will complete the Work within one year of the Effective Date. All <br /> Work will be completed in a good and workmanlike manner in accordance with accepted design <br /> and construction practices and consistent with the Improvement Plans. This completion date may <br /> be extended by City in its sole and absolute discretion at the request of Developer,which request <br /> shall be accompanied by a written assurance acceptable to the City Engineer that the securities <br /> required by Section 13 shall remain enforceable throughout the term of the extension. <br /> 4 2 Notwithstanding the preceding section 4.1,if delays occur in the construction of <br /> an Improvement, through events or circumstances not within the direct control of Developer, <br /> Developer will not be considered to be in default of its obligations to construct the Improvement. <br /> Developer shall be excused for,among other things, any delays or defaults in the performance of <br /> this Agreement unavoidably caused by the City or any other governmental authority,acts of God, <br /> the elements,war,litigation,strikes,walkouts or other causes beyond Developer's control. <br /> 5. Estimated Cost of Work. The engineer's estimated cost of the Work is One Hundred <br /> Thirty Five Thousand Six Hundred Sixty Four and No/100 Dollars ($135,664.00) ("Estimated Cost of <br /> Work"). <br /> 6. Modifications to the Plans. Approval of this Agreement by City does not release <br /> Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. If,at <br /> any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement Plans are <br /> deemed inadequate in any respect,Developer agrees to make such modifications,changes or revisions as <br /> necessary in order to complete the Work in a good and workmanlike manner in accordance with accepted <br /> design and construction standards and consistent with the Conditions and Improvement Plans. <br /> 7. Repairs. Developer agrees to repair or have repaired in a timely manner at its sole cost <br /> and expense all public roads, streets, or other public or private property damaged as a result of or <br /> incidental to the Work or in connection with the development of the Property, or to pay to the property <br /> owner of any damaged road, street or property the full cost of such repair. In addition,Developer shall <br /> endeavor to obtain the written acceptance of such repair or payment from any owner whose private or <br /> public property was repaired by Developer or to whom Developer has paid the full cost of such repair in <br /> accordance with this Section 7. City shall be under no obligation whatsoever to accept the Work <br /> completed under this Agreement until such time as all repairs have been completed or have been paid for <br /> and written acceptances have been provided to the City Engineer. <br /> 8. Foreman or Superintendent. Developer shall give personal attention to the Work. A <br /> competent foreman or superintendent, satisfactory to the City Engineer in his reasonable discretion with <br /> authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br /> commencement of the Work, shall be present on the Property during the performance of the Work and <br /> may not be changed without advance notification to and the concurrence of the City Engineer. <br /> 9. Examination of Work. All of the Work shall be consistent with the Improvement Plans <br /> and performed to the satisfaction of the City Engineer, in his reasonable discretion. City and its <br /> authorized agents shall,at all times during the performance of the Work,have free access to the Property <br /> REV:02-20-15 VR <br /> Page of21 <br /> ATTY/AGR.2015.034/SunCap Redwood LLC(IA) <br />
The URL can be used to link to this page
Your browser does not support the video tag.