My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-05-04 Closed Interview and Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-05-04 Closed Interview and Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:07:37 PM
Creation date
4/30/2015 1:11:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/4/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 8 <br /> G . City and Developer desire to enter this agreement providing for the construction and <br /> installation of the Improvements in accordance with the Improvement Plans. <br /> AGREEMENT <br /> NOW,THEREFORE,in consideration of the faithful performance of the terms and conditions set <br /> forth in this Agreement,the parties hereto agree as follows: <br /> 1, Purpose. The purpose of this Agreement is to guarantee completion of the Improvements <br /> and ensure satisfactory performance by Developer of Developer's obligations to satisfy the Conditions <br /> pertaining to the Improvements. <br /> 2. Property Subject to Agreement. The Property shall be subject to this Agreement. <br /> 3. Duty to Install Improvements. Developer will construct,install and complete,or cause to <br /> be constructed, installed and completed, at the Developer's sole cost and expense, the Improvements, in <br /> accordance with the Improvement Plans (defined in Recital E. above) and to the satisfaction of the City <br /> Engineer, in his reasonable discretion. Developer will also supply all labor and materials therefor,all in <br /> strict accordance with the terms and conditions of this Agreement. In the event of any inconsistency <br /> between the description of the Improvements in this Section 3,inclusive,and the Improvements described <br /> in Exhibit B, the latter shall control. The Improvements shall include, but are not necessarily limited to, <br /> all of the following: <br /> (a) grading,paving <br /> (b) curbs,gutters,concrete walkways,driveways <br /> (c) sanitary sewer system,complete <br /> (d) permeable pavers <br /> (e) water system,complete <br /> (f) storm drainage system,complete <br /> (g) street trees <br /> (h) landscaping and irrigation system complete <br /> (i) utility joint trenching <br /> (j) all Conditions of the Tentative Map <br /> (k) and all other work, improvements, or construction required by or specified in the <br /> abovementioned plans and specifications, conditions of permits and all construction, <br /> appurtenances and improvements necessary as reasonable determined by the City <br /> Engineer to complete the aforementioned improvements, both within and outside of <br /> the Property. <br /> • <br /> The construction, installation and completion of the Improvements and all labor and materials furnished <br /> in connection therewith are hereinafter referred to collectively as the "Work." The Work and <br /> Improvements shall be in strict compliance with the provisions of Chapter 30 of the Redwood City Code. <br /> REV:02-20-15 VR <br /> Page 2 of21 <br /> ATTY/AGR.2015.034/SunCap Redwood LLC(IA) <br />
The URL can be used to link to this page
Your browser does not support the video tag.