Laserfiche WebLink
The deliverable for Task 3 will be the Preliminary Va/ue Ana/ysis Study Report in five <br /> hard copies and one electronic copy. <br /> Task 4: Implementation and Final Report <br /> The VA Team Leader will facilitate a VA Study Implementation Meeting to determine the <br /> status of each VA alternative (i.e. whether it is accepted or rejected). This meeting is <br /> normally a one to two hour meeting. Following this meeting, one of the two following <br /> deliverables will be developed within 10 working days of the conclusion of the VA Study <br /> Implementation meeting. Please note that the timing of this meeting is dependent upon <br /> the City and the availability of the required stakeholders. <br /> • VA Implementation Action Memorandum <br /> If the disposition of all VA altematives (i.e. accepted or rejected) cannot be <br /> detertnined at the VA Study Implementation Meeting, a VA Imp/ementation <br /> Action Memorandum will be prepared and submitted. This will state which <br /> altematives are accepted, which are rejected and the rationale for rejection, and <br /> which VA altematives are conditionally accepted with further study required. The <br /> memorandum will define, for each conditionally accepted altemative, what action <br /> must be completed so that a decision can be made regarding its disposition, <br /> when that action is expected to be completed, and who is responsible to <br /> complete this action. <br /> • Final Report <br /> Once all VA alternatives have been either accepted or rejected, the VA Team <br /> Leader updates the Preliminary Va/ue Ana/ysis Study Report to show the final <br /> results of the study in a Fina/ Value Analysis Sfudy Report. <br /> The deliverable for Task 4 will be either: a) a VA Imp/ementation Action Memorandum <br /> and a Fina/ Va/ue Ana/ysis Study Report, each in five hard copies and one electronic <br /> copy; or b) a Fina/ Value Ana/ysis Study Report, in five hard copies and one electronic <br /> �PY- <br /> REV:04-15-15 VR <br /> Page 11 of 15 <br /> ATTY/AGR.2015.065Nalue Management Strategies, Inc. <br />