My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:25:32 PM
Creation date
6/9/2015 3:25:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Professional Engineering Services Potential improvements t Seaport Centre Maintenance District
RMP File Number
304.5
Date
5/22/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3. Project Prioritization, Assessment Calculations, and Report <br /> Task 3a. Project Prioritization <br /> Consultant will prioritize the proposed projects identified in Task 2b. Consultant will <br /> meet with City staff to review the projects and evaluate the critical projects that would <br /> result in failure or poor performance of the system. Projects will be ranked and given an <br /> expected date for repair for the upcoming budget cycle. <br /> Task 3b. Assessment Calculations <br /> Assessments will not be calculated as part of this Agreement. <br /> Task 3c. Conditions Report <br /> Consultant will compile all the information from the above tasks to create the Conditions <br /> Report. Consultant will also include Exhibits from as-built and record information, as <br /> needed. <br /> Task 3d. Potential FEMA FIRM Revisions —Technical Memo and Exhibits <br /> It is expected that FEMA will be updating the Flood Insurance Rate Maps in July of <br /> 2015 and that the District will be impacted by the potential updates. Specifically, <br /> improvements to the existing levee and flood protection systems may be necessary. <br /> The survey of levee heights will be plotted on a similar plan and profile as previous <br /> levee height survey. Conceptual level calculation of the volumes and costs which it will <br /> take to raise the levees, both the earthen levees and the structural wall portions, from <br /> the present condition to the anticipated new FEMA standard of Elev. 112.0 (mean sea <br /> level =100 ft.) expected to be stated on the Conditional Maps due in July, 2015. This <br /> particular rough order of estimate will not be prepared with bid-level unit prices, <br /> geotechnical design requirements or permit approval timing and costs in hand. <br /> A technical memorandum will be provided that describes the evaluation and identi�es <br /> the construction costs. Exhibits showing the levee elevations relative to the anticipated <br /> BFE of 112.0 will be attached to the memo. <br /> Time Frame <br /> Upon receipt of notice to proceed, the Consultant shall commence work and complete <br /> all tasks listed in Scope of Services. All work shall be completed on or before June 12, <br /> 2015, with the dates for the submission of specific deliverables shall be as follows: <br /> 1. June 12, 2015 - Task 3C: Update of the 2010 Conditions Report with status of <br /> current levees <br /> 2. June 12, 2015 - Task 3D: Technical Memorandum on improvements and costs <br /> REV:05-11-15 VR <br /> Page 10 of 12 <br /> ATTY/AGR.2015.092/BKF-Condition Report Update-Levee Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.