My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:25:32 PM
Creation date
6/9/2015 3:25:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Professional Engineering Services Potential improvements t Seaport Centre Maintenance District
RMP File Number
304.5
Date
5/22/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> Scoae of Services: <br /> Consultant will provide professional engineering services to the City's Community <br /> Development Department in regards to current and potential improvements needed for <br /> Seaport Centre Maintenance District. <br /> Task 1. Data Collection and Existing Conditions Evaluations <br /> Task 1a. Attend Coordination Meetings and Project Management <br /> Consultant will coordinate with property owners and tenants, as needed, to ensure <br /> timely progress is made. This includes coordinating site access for survey crews. <br /> Task 1 b. Site Review, Survey, and Observations <br /> CONSULTANT will perform a site walk of the pertinent areas. Consultant will review <br /> levee structures and bay side erosion control, such as potential sloughing or rip-rap <br /> attrition. Levee review will be limited to obvious flaws and does not include any <br /> structural or geotechnical analysis. A topographic survey will be prepared to document <br /> the crest height of the levees. GPS (NAVD88) survey shots will be taken every 50-feet <br /> along the overall levee length of approximately 5,200-feet. The elevation datum of this <br /> survey will match the previous survey performed in 2010, for easy comparison. <br /> Task 2. Evaluate Proposed Projects and Probable Construction Cost <br /> Task 2a. Inspection and Observation Evaluatfon <br /> Consultants will compile the inspection and observation data for further review. Review <br /> will include identifying specific deficiencies and areas that may need repair in the near <br /> future. These areas will be tabulated and located on an exhibit for later use in the <br /> report. <br /> Task 2b. Proposed Project Identification <br /> Based on the areas identified in Task 2a, Consultant will outline conceptual repair <br /> projects. Concepts will be described in short list form, given identification numbers for <br /> cross-referencing and shown schematically on an exhibit for later use in the repo�t. <br /> The survey of levee heights will be plotted on a similar plan and profile as previous <br /> levee height survey done that was done in 2010. This will help identify locations that <br /> may have settted, or that may have been recently improved relative to the previous <br /> survey. Conceptual level calculation of the volumes and costs which it will take to raise <br /> the levees, both the earthen levees and the structural wall portions, from the present <br /> condition to the current base flood elevation plus freeboard of 10.8 (NAVD88). <br /> Task 2c. Engineer's Opinion of Probable Construction Cost <br /> Based on the projects identified in Task 2b, Consultant will prepare an Engineer's <br /> Opinion of Probable Construction cost. At a conceptual level, these costs will be based <br /> on typical unit cost of replacement and reflective of the conceptual nature of the <br /> proposed work. Consultant will not be obtaining bid costs from contractors. <br /> REV:05-11-15 VR <br /> Page 9 of 12 <br /> ATTY/AGR2015.092/BKF-Condition Report Update-Levee Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.