My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-06-22 Interview and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-06-22 Interview and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2015 5:05:47 PM
Creation date
6/18/2015 5:35:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/22/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br /> <br />June 22, 2015 <br /> <br />SUBJECT <br />Final map for condominium purposes, improvement agreement, landscape maintenance <br />agreement, and stormwater treatment measures management agreement, for the <br />development of Blu Harbor (formerly Pete’s Harbor) at 1 Uccelli Boulevard by RWC <br />Harbor Communities, LLC. <br /> <br />RECOMMENDATION <br />1. By motion, approve the Final Map for condominium purposes for 402 unit subdivision <br />at Blu Harbor, 1 Uccelli Boulevard. <br />2. By motion, approve and authorize the City Manager to execute an Improvement <br />Agreement, Landscape Maintenance Agreement, and Stormwater Treatment Measure <br />Maintenance Agreement with RWC Harbor Communities, LLC. <br /> <br />BACKGROUND <br />The project is a 3 lot subdivision for 402 residential condo units with six (6) 9-unit <br />buildings, four (4) 10-unit buildings, and a larger building wrapped around a parking <br />structure that contains remaining 308 units. The project also consists of other onsite <br />improvements, including a recreation building, private roadways, an inner marina, public <br />access areas for pedestrian and bike paths surrounding the sloughs and connected to <br />the Bay trail, and a recycled water main and looped domestic water main in a public <br />easement. Offsite improvements include new domestic and recycled water mains, storm <br />drain connections, a sanitary sewer main, an 8’ bike trail, and improved crosswalk to <br />provide connectivity to the Bair Island road bike trail, and the bay trail. The Planning <br />Commission approved the Tentative Parcel Map and Planned Development permit for <br />Pete’s Harbor (previous name). The existing 13.25 acre lot was an inactive restaurant <br />and marina, parking, and a soil stockpiling area for nearby developments. <br /> <br />ANALYSIS <br />The developer’s engineer completed the final map for condominium purposes, <br />improvement plans, and specifications compliant with the Subdivision Map Act, <br />Redwood City Ordinances, City Standards, and to the satisfaction of the City Engineer. <br />The final map subdivides one existing parcel into three lots, and 302 residential condo <br />units. Improvements include new sewer and water services, stormwater treatment <br />7.1.K. - Page 1
The URL can be used to link to this page
Your browser does not support the video tag.