My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-06-22 Interview and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-06-22 Interview and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2015 5:05:47 PM
Creation date
6/18/2015 5:35:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/22/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Attribute & Performance Measures <br />(PROPOSED) Data Collection Locations (PROPOSED) <br />Air Quality Calculated vehicle emissions along length of the project <br />Congestion <br /> Average peak period travel time <br /> Average off‐peak travel time <br /> <br /> Peak hour traffic volume <br /> <br /> <br /> <br /> <br /> Intersection Level of Service <br />(LOS) for vehicles (measure of <br />vehicle delay at intersections, A‐ <br />F rating) <br /> <br /> <br /> Woodhill Drive to Alameda de las Pulgas <br /> Woodhill Drive to Alameda de las Pulgas <br /> <br /> Between Eden Bower and Lonesome Pine <br /> Between McGarvey and Jefferson <br /> Between Highland and Alameda de las Pulgas <br /> <br /> <br /> Farm Hill at Emerald Hill <br /> Farm Hill at Glennan <br /> Farm Hill at Jefferson <br /> Farm Hill at McGarvey <br />Ease of crossing the street <br /> Percent of vehicles yielding to <br />people crossing the street <br /> How long people walking have <br />to wait to cross the street <br />(same locations for both measures) <br /> Farm Hill at Eden Bower (PM) <br /> Jefferson at Dover <br />Ease of entering traffic <br /> Average vehicle delay for <br />vehicles trying to make a left‐ <br />turn from side street during the <br />morning peak <br /> <br /> Lonesome Pine <br /> Highland <br /> <br />Complete Street <br /> Description of design by mode <br /> <br /> <br /> Number of people riding bikes <br /> Number of people walking along <br />the street <br /> Number of people crossing the <br />street <br /> Percent of people arriving <br />without driving <br /> <br /> Between Jefferson and McGarvey <br /> <br />(same locations for all measures) <br /> Farm Hill at Emerald Hill <br /> Farm Hill at Glennan <br /> <br /> <br /> <br /> Stulsaft Park <br />Safety <br /> Number of conflict points at <br />intersection and midblock <br />locations <br /> Average number of monthly <br />crashes <br /> <br /> Jefferson at Altamont Way <br /> Between Emerald Hill and Brandy Rock Way <br /> <br /> Woodhill Drive to Alameda de las Pulgas <br />7.1.C. - Page 11
The URL can be used to link to this page
Your browser does not support the video tag.