Laserfiche WebLink
  <br />  <br />ATTACHMENT 3: EVALUATION PLAN <br /> <br /> <br />Farm Hill Boulevard Pilot Street Improvement Project <br />Draft Evaluation Plan  <br />  <br />The following table outlines data that will be collected to evaluate the performance of the pilot project.  <br />The same data will be collected before the pilot starts and before it ends.  <br />Attribute & Performance Measures  <br />(PROPOSED) Data Collection Locations (PROPOSED)  <br />Air Quality Calculated vehicle emissions along length of the project   <br />Congestion  <br /> Average peak period travel time  <br /> Average off‐peak travel time  <br />  <br /> Peak hour traffic volume  <br />  <br />  <br />  <br />  <br /> Average vehicle delay at  <br />intersections  <br />  <br />  <br /> Woodhill Drive to Alameda de las Pulgas  <br /> Woodhill Drive to Alameda de las Pulgas  <br />  <br /> Between Eden Bower and Lonesome Pine  <br /> Between McGarvey and Jefferson  <br /> Between Highland and Alameda de las Pulgas  <br />  <br />  <br /> Farm Hill at Emerald Hill  <br /> Farm Hill at Glennan  <br /> Farm Hill at Jefferson  <br /> Farm Hill at McGarvey  <br />Ease of crossing the street  <br /> Percent of vehicles yielding to  <br />people crossing the street   <br /> How long people walking have  <br />to wait to cross the street  <br />(same locations for both measures)  <br /> Farm Hill at Eden Bower  (PM)  <br /> Jefferson at Dover  <br />Ease of entering traffic  <br /> Average vehicle delay for  <br />vehicles trying to make a left‐ <br />turn from side street during the  <br />morning peak   <br />  <br /> Lonesome Pine  <br /> Highland  <br />  <br />7.1.C. - Page 13