Laserfiche WebLink
  <br />  <br />Attribute & Performance Measures  <br />(PROPOSED) Data Collection Locations (PROPOSED)  <br />Complete Street  <br /> Description of design by mode  <br /> Number of passengers getting  <br />on/off SamTrans buses  <br />  <br /> Number of people riding bikes  <br /> Number of people walking along  <br />the street  <br /> Number of people crossing the  <br />street  <br />  <br /> Percent of people arriving  <br />without driving  <br />  <br /> Between Jefferson and McGarvey  <br /> All stops along the corridor  <br />  <br />(same locations for all measures)  <br /> Farm Hill at Glennan  <br /> Farm Hill at Jefferson   <br /> Farm Hill at McGarvey  <br />  <br />  <br />  <br /> Stulsaft Park  <br />Safety  <br /> Number of conflict points at  <br />intersection and midblock  <br />locations  <br /> Average number of monthly  <br />crashes  <br />  <br /> Jefferson at Altamont Way  <br /> Between Emerald Hill and Brandy Rock Way  <br />  <br />  Woodhill Drive to Alameda de las Pulgas  <br />Speeding  <br /> 85th percentile speed (85% of  <br />drivers travel at or below this  <br />speed)  <br /> 50th percentile speed (median  <br />speed)  <br /> Percent of vehicles traveling 10  <br />mph or more over the speed  <br />limit  <br /> Percent of vehicles traveling  <br />over speed limit  <br />(same locations for all measures)  <br /> Between Eden Bower and Lonesome Pine  <br /> Between McGarvey and Jefferson  <br /> Between Highland and Alameda de las Pulgas  <br />7.1.C. - Page 14