Laserfiche WebLink
__ �; <br /> PAYMENT TERMS: <br /> Contractor shall be paid on the basis of actual auantitv of work completed based on <br /> the cost schedule shown below not to exceed 5172.405.46. The fee shall nclude all <br /> labor, materials, and equipment necessary to clean and nspect manholes, clean and <br /> inspect sewer lines, inplementing traffic control, procuring water, disposing of debris, and <br /> delivering hard drive as noted. <br /> ITEM DESCRIPTION QTY UNIT PRICE TOTAL <br /> 1 asin - ean ,9 •� � <br /> asm a - ean , • � <br /> 3 asm - ean 6 �• 8 � <br /> 4 asm o. - ean '1 �• $ � <br /> 5 asin o. - ean , 1. 8 , 2 . <br /> 6 asin ean 819 .7 2 7. 2 <br /> 7 asm - ean 4 9 1.7 5 .6 <br /> GRAND TOTAL: $172,405.46 <br /> Basin No.5D--39,5301inearfeet <br /> 3 Man Crewwith Vacuum Truck,CCN Unit&PickupTruck-480 man-hoursto <br /> complete. <br /> Basin No.5+4--57,327 linearfeet <br /> 3 Man Crewwith Vacuum Truck, CCTV Unit 8�Pickup Truck-696 man-hours to complete. <br /> `Costs Includes mobilization, 8 hours on job with tra�c control setup, getting water for <br /> cleaning truck, disposal of debris, disposal of hazardous materials(if there's any) as well as <br /> clean and CCN of sewer lines. <br /> Total Contract Amount:$172,405.46 <br /> REV:05-22-15 <br /> Page 12 of 12 <br /> ATTY/AGR.2015.102/Professional Pipe Services <br />