My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Professional Pipe Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Professional Pipe Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2015 10:16:26 AM
Creation date
6/29/2015 10:16:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Professional Pipe Services
PROJECT NAME
Closed Circuit TV inspection of selected pipelines in Sanitary Sewer basins 5A and 5D
RMP File Number
304
Date
6/26/2015
MO Ref
15-095
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ �; <br /> PAYMENT TERMS: <br /> Contractor shall be paid on the basis of actual auantitv of work completed based on <br /> the cost schedule shown below not to exceed 5172.405.46. The fee shall nclude all <br /> labor, materials, and equipment necessary to clean and nspect manholes, clean and <br /> inspect sewer lines, inplementing traffic control, procuring water, disposing of debris, and <br /> delivering hard drive as noted. <br /> ITEM DESCRIPTION QTY UNIT PRICE TOTAL <br /> 1 asin - ean ,9 •� � <br /> asm a - ean , • � <br /> 3 asm - ean 6 �• 8 � <br /> 4 asm o. - ean '1 �• $ � <br /> 5 asin o. - ean , 1. 8 , 2 . <br /> 6 asin ean 819 .7 2 7. 2 <br /> 7 asm - ean 4 9 1.7 5 .6 <br /> GRAND TOTAL: $172,405.46 <br /> Basin No.5D--39,5301inearfeet <br /> 3 Man Crewwith Vacuum Truck,CCN Unit&PickupTruck-480 man-hoursto <br /> complete. <br /> Basin No.5+4--57,327 linearfeet <br /> 3 Man Crewwith Vacuum Truck, CCTV Unit 8�Pickup Truck-696 man-hours to complete. <br /> `Costs Includes mobilization, 8 hours on job with tra�c control setup, getting water for <br /> cleaning truck, disposal of debris, disposal of hazardous materials(if there's any) as well as <br /> clean and CCN of sewer lines. <br /> Total Contract Amount:$172,405.46 <br /> REV:05-22-15 <br /> Page 12 of 12 <br /> ATTY/AGR.2015.102/Professional Pipe Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.