Laserfiche WebLink
Nfght Work <br /> f flow and/or traffic are an issue for CONTRACTOR to complete a segment, arrangements <br /> will be made with City to work at night. CONTRACTOR shall provide <br /> businesses/residences 48 hours prior notice of any potentially disruptive activity. Additional <br /> compensation for night work will not be paid by the City. <br /> DELIVERABLES: <br /> 1. Deliverables shall nclude CCTV inspection videos, pictures and databases n an <br /> extemal ha�d drive as mentioned herein; manhole �spection reports; printed CCN <br /> nspection reports; summary of CCTV inspection reports in excel format (see detaiis <br /> below), color coded sewer basin site maps (see details below); MPEG-4 format color <br /> video. <br /> 2 Submit summary of the CCN nspection reports in excel format showing the <br /> following: inspection ID, pipe segment reference, date of inspection, street name, <br /> upstream manhole no. designation, downstream manhole no. designation, sewer use, <br /> direction of flow,flow control,size of pipe,type of pipe, shape of pipe, pipe joint length, <br /> total pipe length, actual pipe length surveyed, pre-cleaning method use, weather <br /> condition and the overall pipe rating condition of the plpe segments (from MH to MH) <br /> indicating the following ratings 1 - if the pipe is in excellent condition, 2 if the pipe is in <br /> good condition, 3- �the pipe is in fair condition, 4 f the pipe is � poor condition and 5- <br /> if the pipe is in bad condition and needing immediate removal and replacement. <br /> 3. Submit a GIS map with color coded sewer basin site map or a physical map with <br /> the segments color coded by hand showing pipe segments (from manhole to manhole) <br /> pipe condition rate designation in color coding as follows:Pipe segments(from manholeto <br /> manhole)with 1 - excellent pipe rating condition in blue color; pipe segments with 2- <br /> good pipe rating condition in green color; pipe segments with 3-fair pipe rating condition <br /> in pink color ;pipe segments with 4- poor pipe rating condition in orange color and pipe <br /> segments with 5 bad pipe rating condition in red color. <br /> DEADLI N E: ! <br /> CONTRACTOR shall complete all work within 60 (sixty) working days of the City's notice 1 <br /> to proceed. CONTRACTOR shall put a third crew on this project if needed. CONTRACTOR 1 <br /> shall average about 3,000 linear feet per day, per crew, which shall allow CONTRACTOR to <br /> finish within the City's timeframe. CONTRACTOR shall provide the Ciry with a detailed <br /> work schedule, to include streets and dates, at City's request. <br /> REV:05-22-15 <br /> Page li of 12 <br /> ATTY/AGR.2015.102/Professional Pipe Services <br />