Laserfiche WebLink
EXH- <br /> SCOPE OF WORK. DEADLINE AND PAYMENT TERMS PROJECT <br /> DESCRIPTION: <br /> Cbsed circu� television (CCN) inspection, and cleanng for that purpose, of selected <br /> pQelines n sanitary sewer basins 5A and 5D. <br /> SCOPE OF WORK: <br /> The scope of work described herein is the minimum necessary to meet the City's <br /> objectives. The CONTRACTOR's expected to expand on the scope by ncorporating their <br /> expertise and proposed method of approach. <br /> The scope of work for the project shall inciude the furnishing of all labor, materials, and <br /> equipment necessary to clean the sewer pipelnes,inspect manholes and provide a closed- <br /> circu� telev'sion nspection in dig�al format of the sewer pipelines listed above. The word <br /> "clean" is defined as the removal of all accumulations including sludge, dirt, sand, rocks, <br /> grease, roots, and other solid or sem'soid material�the pipe and manhole. <br /> Cleaning <br /> The CONTRACTOR shali perfo�rn a mhimum of two (2) passes using the high-vebcity <br /> hydraulic cleaning method. The contractor shail clean the line until the ine is ready for <br /> cbsed-circuit television nspection that is acceptable to Cty. No additional compensation will <br /> be made to the CONTRACTOR n performing three or more passes in cleaning the sewer <br /> line. All pipe cleanng cost method and duration shall be ncluded in the agreed cost <br /> 'rrespective of the type and size of the existing sewer ines. f a video and/or the capture <br /> inages inthe database do not clearly show the p�e conditions due to nadequate clean-up or <br /> are of such poor quality that the Engineer's unable to evaluate the conditan of the sewer or <br /> bcate sewer service connections, the CONTRACTOR shall re-televise that section of the <br /> pipe at CONTRACTOR'S expense. <br /> The CONTRACTOR shali protect the manholes to withstand forces generated by equipment, <br /> water, and air pressure.The CONTRACTOR shall clean the sewer pipe of any obstruction and <br /> debris ncluding roots in accordance with the "Standard Specifications for Public Wo�ks <br /> Construction (Green book)", latest edition. <br /> CONTRACTOR shall use a jet/vacuum combination unit for deaning all sewer lines. The <br /> combination unit shail operate at 80 gallons per minute at a pressure of 2,500 psi, and be <br /> equipped with approximately 800 linear feet of hose. CONTRACTOR' S operating <br /> technicians shall have a minimum of 3 years of experience cleaning with this piece of <br /> equQment. CONTRACTOR shall clean the hes in a downstream di�ectian, beginning from the <br /> most upstream manhole of a particular reach or set of reaches, and begn cleaning so that the <br /> debris will continually be pulled downstream. <br /> In order to jet clean the lines, a high pressure water pump on the combination truck shall <br /> deliver water from attached tanks through a high pressure hose to a cleaning noale. The <br /> water pumped through the cleaning noale shall propel the nozzle and attached high <br /> pressure hose through the sewer. Once the cleaning noule has arrived at an upstream <br /> manhole, the noule shall be pulled back through the ppe at a veloc�ty controlled by the <br /> operator. During the cleaning process, the cleaning noule will not travel faster than one foot <br /> per second in the line.While the cleaning noule is pulled back, the vacuum system shall be <br /> used to simu�aneousy remove debris flushed bythe cleaning nozzle. <br /> REV:OS-22-15 <br /> Page 6 of 12 <br /> ATTY/AGR.2015.102/Professional Pipe Services <br />