My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-11 PC Reso (3107) Tentative Map 150 ECR and 20 Avondale
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-11 PC Reso (3107) Tentative Map 150 ECR and 20 Avondale
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 9:17:22 AM
Creation date
7/6/2015 9:13:36 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
6/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
amount of fee will be based on the project's sewage generation projection <br /> (Attachment L of the City's Engineering Standards). <br /> 33. Grading shall be performed in accordance with Volume I I i, Part I I of the City's <br /> Engineering Standards <br /> (www. redwoodcity. or_g/cds/engineering/standards/desi „ nq /PartV). Soil or other <br /> construction materials shall not be stockpiled in the public right-of-way. <br /> Applicant shall submit cut/fill volumes (CY) for all soils to be imported to or <br /> exported from the site. <br /> 34 . Continuous site inspection shall be provided by a Soils Engineer at the <br /> Developer's expense during trenching and backfill operations. The Soils <br /> Engineer shall take compaction tests, and shall submit test results to <br /> Engineering & Construction . <br /> 35 . Post-construction runoff into the storm drain shall not exceed pre-construction <br /> runoff levels. The applicant's design professional shall evaluate the project's <br /> impact to the City's storm drainage system and shall substantiate their <br /> conclusions with drainage calculations to the satisfaction of the City Engineer. <br /> The project shall be designed in conformance with the Drainage Guidelines <br /> for Commercial Development, found on the City's website at <br /> 36. htt • ://www. redwoodcit .or./bitlinfrastructurefidf/Drainage Guidelines Comm <br /> ercial 2005-02-01 .pdf <br /> 37 . Stormwater Pollution Prevention Program Best Management Practices <br /> (BMPs) for construction shall be implemented to protect water quality, in <br /> accordance with the approved Stormwater Pollution Prevention Plan <br /> (SWPPP). BMP plan sheets are available electronically for inserting into <br /> project plans. <br /> 38 . Plans shall be designed to meet the C3 requirements of the Municipal <br /> Regional Permit (MRP) NPDES Permit CAS 612008. <br /> 39. If construction is not complete by the start of the wet season (October 1 <br /> through April 30), the applicant shall implement a winterization program to <br /> minimize the potential for erosion and sedimentation . As appropriate to the <br /> site and status of construction , winterization requirements shall include <br /> inspecting/maintaining/cleaning all soil erosion and sedimentation controls <br /> prior to, during, and immediately after each storm event; stabilizing disturbed <br /> soils through temporary or permanent seeding, mulching , matting , tarping or <br /> other physical means; rocking unpaved vehicle access to limit dispersion of <br /> much onto public right-of-way; and covering/tarping stored construction <br /> materials, fuels, and other chemicals. Plans to include proposed measures to <br /> prevent erosion and polluted runoff from all site conditions shall be submitted <br /> for approval by CDD prior to beginning construction . As site conditions <br /> warrant, the City Engineer may direct the applicant to implement additional <br /> winterization requirements. <br /> 40 . LID treatment measures to be shown on final improvement or grading plans <br /> shall not differ materially from the LID treatment measures presented on the <br /> ATTY/RES0.3107/PC RESO TENTATIVE MAP 150 EL CAMINO & 20 AVONDALE <br /> REV: 06-23-15 VR <br /> Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.