My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-11 PC Reso (3107) Tentative Map 150 ECR and 20 Avondale
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-11 PC Reso (3107) Tentative Map 150 ECR and 20 Avondale
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 9:17:22 AM
Creation date
7/6/2015 9:13:36 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
6/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
entire street frontage of the project. The main for the project will extend from <br /> a connection to the 6" main on El Camino Real to the nearest point of <br /> connection to the 8" main westerly of the project on Avondale. New water <br /> main(s) shall be constructed and installed in accordance with the City's <br /> Engineering Standards and as directed by the City Engineer. <br /> 27. The water main on the project site shall be a public main, at least 8" in size, <br /> and designed and installed per City Standards. The project shall explore <br /> whether providing a looped water main (connecting to the City system at two <br /> locations) is feasible. If the main is a dead-end line , a blow off valve shall be <br /> provided at the end of the line to allow for flushing of the line. <br /> 28 . The project is not currently proposing to use permeable pavers within the <br /> private street/driveway. If the project changes to include permeable pavers, <br /> the City standard utility trench detail must be adhered to below the pavement <br /> section required for the permeable pavers where a public water main is <br /> located below a permeable pavement section . In some cases, this may <br /> require additional cover over the water main to allow for both the required <br /> stormwater volume and adequate water main protection. <br /> 29. Prior to issuance of any grading or encroachment permit, applicant shall <br /> submit to City, and obtain approval of, an evaluation and report, prepared by <br /> a licensed engineer, in conformance with the City's Engineering Standards, <br /> demonstrating that the proposed water main meets the domestic and fire flow <br /> requirements in accordance with City Code Section 38.26 and the <br /> International Fire Code. <br /> 30. Backflow protection on fire, and irrigation water services shall be required . <br /> The backflow preventer shall be above grade, and shall be located on private <br /> property, accessible to the Public Works division and/or Fire Department from <br /> the outside for testing. <br /> 31 . Prior to issuance of any encroachment permit, applicant shall submit to City, <br /> and obtain approval of, an evaluation and report, prepared by a licensed <br /> engineer, in conformance with the City's Engineering Standards, <br /> demonstrating that the existing sewer mains have sufficient capacity for the <br /> Project. The study shall consider existing , project, other approved projects, <br /> and applications currently under review in determining the needed capacity. If <br /> the existing sewer main is not sufficient as determined by the City Engineer, <br /> applicant shall, as part of the Project, construct and install new sewer mains <br /> sufficient to meet such requirements, in accordance with the City's <br /> Engineering standards and as directed by the City Engineer to the City <br /> Engineer's satisfaction. <br /> 32. Redwood City has exceeded its Peak Wet Weather Flow (PWWF) capacity in <br /> the past. A methodology to reduce inflow and infiltration by pipe replacement <br /> was determined . The applicant shall reduce inflow and infiltration to offset <br /> increased sewer demand from the project by replacing aged sewer mains or <br /> pay an equivalent in-lieu fee. The length of pipe replacement required or the <br /> ATTY/RESO.3107/PC RESO TENTATIVE MAP 150 EL CAMINO & 20 AVONDALE <br /> REV: 06-23-15 VR <br /> Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.