My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-09 PC Reso (3108) Recommending Approval of Tentative Parcel Map - 815 Hamilton
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-09 PC Reso (3108) Recommending Approval of Tentative Parcel Map - 815 Hamilton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 9:18:31 AM
Creation date
7/6/2015 9:13:55 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
6/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. Remove all visible mud or dirt track-out onto adjacent public roads using wet <br /> power vacuum street sweepers at least once per day. Dry power sweeping is <br /> prohibited. <br /> d. Limit speeds of all vehicle on unpaved roads to 15 mph . <br /> e. Pave all roadways , driveways, and sidewalks as soon as possible . Building <br /> pads shall be laid as soon as possible after grading unless seeding or soil <br /> binders are used . <br /> f. Minimize idling times either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes (as required by the California <br /> airborne toxics control measure Title 13, Section 2485 of California Code of <br /> Regulations [OCR]). Provide clear signage for construction workers at all <br /> access points. <br /> g . Maintain and properly tune all construction equipment in accordance with <br /> manufacturer's specifications . All equipment shall be checked by a certified <br /> visible emissions evaluator. <br /> IT Post a publicly visible sign with the telephone number and person to contact at <br /> the lead agency regarding dust complaints. This person shall respond and take <br /> corrective action within 48 hours . The Air District's phone number shall also be <br /> visible to ensure compliance with applicable regulations. <br /> 74. Stormwater Pollution Prevention Program Best Management Practices (BMPs) - <br /> BMPs for construction shall be implemented to protect water quality, in accordance with <br /> the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are <br /> available electronically for inserting into project plans . [SDR][ENGINEERING] <br /> 75 . NOI - The applicant shall file a Notice of Intent (NOI ) with the State Water Resources <br /> Control Board under the Construction Activities Storm Water General Permit (General <br /> Permit) . The NOI indicates the applicant's intent to comply with the San Mateo <br /> Countywide Stormwater Pollution Prevention Program , including a Stormwater Pollution <br /> Prevention Plan (SWPPP). <br /> 76 . Building Materials Specifications - Buried metal infrastructure shall have cathodic <br /> protecting using a sacrificial anode system that conforms to Part VII (G) of the City's <br /> water system design criteria and standard specification details Section 02661 . <br /> Additionally, concrete mixes shall conform to Caltrans specifications for Protection of <br /> Reinforcement Against Corrosion Due to Chlorides , Acids, and Sulfates as outlined in <br /> the Memo to Designers 10-5, January 2002. [SDR][BUILDING] <br /> 77. Winterizing - If construction is not complete by the start of the wet season (October 1 <br /> through April 30), the applicant shall implement a winterization program to minimize the <br /> potential for erosion and sedimentation . As appropriate to the site and status of <br /> construction , winterization requirements shall include inspecting/maintaining/cleaning all <br /> soil erosion and sedimentation controls prior to, during , and immediately after each storm <br /> event; stabilizing disturbed soils through temporary or permanent seeding , mulching , <br /> matting, tarping or other physical means; rocking unpaved vehicle access to limit dispersion <br /> of much onto public right-of-way; and covering/tarping stored construction materials, fuels, <br /> and other chemicals. Plans to include proposed measures to prevent erosion and polluted <br /> runoff from all site conditions shall be submitted for approval by CDD prior to beginning <br /> construction. As site conditions warrant, the City Engineer may direct the applicant to <br /> implement additional winterization requirements. [COA][ENGINEERING] <br /> ATTY/RES0.3108/PC RESO RECOMMENDING APPROVAL OF TENTATIVE PARCEL MAP — 815 HAMILTON <br /> REV: 06-19-15 VR <br /> Page 18 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.