My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Green Environment
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Green Environment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 3:12:37 PM
Creation date
6/15/2004 11:39:11 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment
PROJECT NAME
consulting services
RMP File Number
304.5
Date
6/3/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />:)n/. Green . <br />~"T'" Environment 'nc. <br />www.greenenvironment.com Page 2 <br /> <br /> <br />Chemical Analyses <br /> <br />Submit samples to a California-certified analytical laboratory with chain-of-custody <br />documentation. Direct analytical laboratory to analyze for the analyses requested by the <br />SBSA and TSDF. Analysis packages will likely include, but are not limited to, Total Oil <br />& Grease via EPA Method 418.1, Volatile Organic Compounds via EPA Method 8260B, <br />Semivolatile Organic Compounds via EP A Method 8270, Organochlorine Pesticides and <br />Polychlorinated Biphenyls via EP A Methods 8081A and 8082, CAM 17 Metals via EP A <br />Methods 6010B/7470 and Total Cyanides via EPA Method EPA 335.2/9010. All <br />analyses will be performed on a standard lab turnaround (5 working days). <br /> <br />Technical Report ~ <br /> <br />Prepare a written report with sampling results and alternatives (with costs) for~'I:.l ':'I,,~ <br />solid waste material handling and disposal. <br /> <br />Schedule <br /> <br />GEl will deliver the written project report within fifteen (15) working days of client <br />approval to proceed. <br /> <br />Project Cost <br />Project will be billed on a time & material basis, at a projected maximum cost of$9000. <br /> <br />Limitations <br /> <br />The project scope does not include disposal of the liquid or solid waste streams generated <br />during this project. Also, if the SBSA or TSDF requests analysis packages that differ <br />from the suite suggested above, this projected maximum cost may be exceeded. Lastly, if <br />the dewatering bins are kept onsite for more than two weeks, this projected maximum <br />cost may be exceeded. <br /> <br />************************************************************************ <br /> <br />The signatures below indicate that Green Environment inc. and the client have <br />agreed upon the scope, sc~cost' and limitations ofthis pro" ct. <br /> <br />'PIMA ~~ ~(p£ ~ <br /> <br />Mark Green Jon Lynch 1 Willis <br />Green Environmen inc. CityofR ood City <br /> <br />((22(01 '/21!n4- <br />D~e ~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />. .- <br />
The URL can be used to link to this page
Your browser does not support the video tag.