7.1.J. - Page 13 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Project Description <br /> The purpose of the design engineering services described below is to prepare construction <br /> documents for streetscape and complete streets improvements for the Middlefield Road <br /> Streetscape Project, between Main Street and Maple Street in Redwood City. The limits of work <br /> are as shown on the draft streetscape plan graphic dated April 2015, which is based on the <br /> Streetscape Concept Plan dated January 6, 2015. <br /> Services <br /> TASK 1 SUPPLEMENTAL FIELD SURVEYING <br /> CONSULTANT will perform field surveying to supplement the aerial topography for the <br /> Middlefield Road Underground Utility Rule 20 Project 2011 -01 (MUUD) project flown in <br /> November 2011. CONSULTANT will use previous survey points for existing storm drain utilities <br /> from the Middlefield Road MUUD project in January 2015, so the new topographic survey will <br /> be focused on the project asphalt and street cross sectional conforms, curb conforms on the <br /> corners, and back of walk. <br /> Task la —Topo First Move -in; The first surveying move -in will be during the 65% design <br /> period after the initial saw cut lines are identified so the survey crew can tie -in street cross <br /> sectional conforms, curb conforms on the corners and back of walk. <br /> Task 1b —Topo Second Move -in: A second move -in for field surveying will be <br /> performed at the end of the 95% design to pick up any remaining critical survey conforms, in <br /> particular at the bulbouts. <br /> TASK 2 — C3 DESIGN <br /> As part of preliminary design CONSULTANT will prepare a two -page technical memorandum <br /> addressing the C3 requirements. As shown on the January 2015 Streetscape Concept Plans, the <br /> design intent is to install rain gardens mid -block as part of the streetscape project. The rain <br /> gardens are sized to treat the storm water discharging from the improved areas and are not <br /> intended to treat the entire street width. The memorandum will document the method and <br /> calculations for sizing the stormwater treatment. <br /> TASK 3 — PARKING COUNT STUDY <br /> CONSULTANT will prepare a summary table outlining the parking counts on Middlefield Road, <br /> block -by- block. The parking counts will be existing parking vs project proposed parking, and <br /> this information will be available for the public meetings, <br /> TASK 4 — SIGNAL MODIFICATIONS & LIGHTING DESIGN <br /> There are two intersections which will require minor traffic signal modifications: Maple <br /> Street /Middlefield Road and Chestnut Street /Middlefield Road. The signal modification plans <br /> for these two intersections will include a) new pedestrian push buttons due to the bulbouts and <br /> relocated ramp locations, and b) new detector loops on Middlefield Road. The street lighting <br /> will be an alternating pattern of pedestrian scale lighting and roadway lighting. The light poles <br /> Page 10of17 <br /> REV: 07 -14 -15 VR <br /> ATTY /AGR.2015.143 /Bellecci & Associates - Middlefield Road Streetscape <br />