My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-07-27 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-07-27 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 8:35:10 AM
Creation date
7/23/2015 5:51:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
895
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.J. - Page 18 <br /> CONSULTANT will update the previous graphical rendering prepared in April 2015, based on the <br /> comments from the public meeting, if the rendering requires a new base plan due to significant <br /> design changes. <br /> 0S3 — NEIGHBORHOOD MARKERS or CUSTOM FURNISHINGS <br /> CONSULTANT will use information from the public outreach process and Workshops to design <br /> Neighborhood Markers or other custom design element. The level of effort for this task will <br /> depend on the complexity of the system selected. Design team will provide a more in -depth <br /> scope of work for this task if it is determined to be included in the project, <br /> 0S4 — ALLOWANCE FOR FOLLOW - UP PUBLIC OUTREACH AFTER WORKSHOP #2 <br /> Shared spaces or other team member will be available for 40 hours of follow -up coordination <br /> with the community after the August 12 community meeting. <br /> OSS — ALLOWANCE FOR ADDITIONAL RIGHT OF WAY RESEARCH <br /> Under separate agreement consultant has collected several deeds confirming City right of way <br /> necessary to construct the project. Currently there are 4 properties within the area that do not <br /> have final deeds confirming the City right of way for the sidewalk widening. This task allows for <br /> 24 additional hours of research at the County records Department. <br /> 0S6 GEOTECHNICAL REPORT <br /> Upon approval of this task, CONSULTANT will retain a geotechnical engineer to perform <br /> pavement coring and prepare a report with pavement design and earthwork design <br /> parameters. If a report is not included in the project, CONSULTANT will work with City staff to <br /> develop standard pavement section thicknesses as part of Basic Services. <br /> 0S7 — PARKING PROTECTED BIKE LANES <br /> As part of the preliminary design process and workshop #2 the City and Design Team may elect <br /> to change the April 2015 design to include parking protected bike lanes. This design approach <br /> will require: a) updating the preliminary design layout of the January 2015 plan which was a <br /> traditional parking and bike lane arrangement, b) additional RHAA landscape design for the . <br /> island and bike buffer, c) RHAA added work to revise the rendering, d) additional traffic signal <br /> modifications and loops for the intersection design, and striping design enhancement for Traffic <br /> Patterns. Updating the preliminary design layout of the January 2015 plan will be completed as <br /> part of the Streetscape Preliminary Design agreement to Bellecci. <br /> Page 15of17 <br /> REV: 07 -1445 VR <br /> ATTY /AGR.2015.143/Bellecci & Associates - Middlefield Road Streetscape <br />
The URL can be used to link to this page
Your browser does not support the video tag.