My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-07-27 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-07-27 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 8:35:10 AM
Creation date
7/23/2015 5:51:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
895
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.G. - Page 2 <br /> Subsequent to the slurry application, the majority of the project roadways will be <br /> restriped /remarked similar to their original configuration. On certain streets, striping will <br /> be added to increase the safety and comfort of people bicycling, consistent with the <br /> City's complete streets goals. Proposed addition includes additional markings on Myrtle <br /> Street and King Street within project area. <br /> Project streets are shown on the attached Project Location Map. <br /> Six (6) bids were received for the 2014 -2015 Slurry Seal Project by the bid deadline on <br /> July 2, 2015. The bid amounts are summarized in the table below. <br /> No. Bidder Bid Amount <br /> 1 Pavement Coatings Co. $463,565.00 <br /> 2 Graham Contractors Inc. $503,557.00 <br /> 3 American Asphalt $524,539.20 <br /> 4 Intermountain Slurry Seal $531,531.00 <br /> 5 Telfer Highway Technologies $533,597.60 <br /> 6 Valley Slurry Seal Co. $537,049.00 <br /> Engineer's Estimate $475,557.00 <br /> The low bid was determined based on the Total Base Bid. The total base bid of <br /> $463,565.00 from Pavement Coatings Co. is approximately 2.5% lower than the <br /> engineer's estimate of $475,557.24 for the cost of construction. Based upon the bids <br /> received, staff believes that the low bid of $463,565.00 is reasonable and responsive, <br /> and recommends awarding the contract to Pavement Coatings Co. <br /> Construction is anticipated to begin in Summer 2015, and conclude by Fall 2015. <br /> Notification of the proposed work will be distributed to area residents, property owners, <br /> business owners, and schools in advance of the start of work. <br /> ALTERNATIVES <br /> Council may choose not to award the construction contract and direct staff to redesign <br /> and /or rebid this project. <br /> FISCAL IMPACT <br /> Funds for Street Pavement Management Programs have been previously approved and <br /> appropriated with an available balance of $401,960.68 in the Transportation Fund and <br /> $1,615,314.40 in the Gas Tax Construction Fund, as of June 30, 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.