Laserfiche WebLink
07/27/2015 <br /> Exhibit 1 <br /> 2012 Redwood City Transportation Impact Mitigation Fee Update <br /> Project Descriptions and Cost Estimates <br /> # Project Description Total Cost' <br /> 1r�l�raa�b��prow�ts <br /> Bay Road/ 1) Provide signal pre-emption <br /> 1 Woodside Road 21 NB Bay Road to provide one left,one through and one shared $34,000 <br /> through/right lane <br /> 2, Bay Road/ Install traffic signal 2 $300,000 <br /> Fifth Avenue <br /> 3 Redwood Shores Parkway/ Install traffic signal Z $300,000 <br /> Bridge Parkway <br /> 4 Charter Sareet Install traffic signal 2 $300,000 <br /> 5 Walnut�Steet Install traffic signal 2 $200,000 <br /> 6 Broadway/ Add second right turn lane on NB Broadway $320,400 <br /> Woodside Road <br /> �, EI Camino ReaU Median closure $42,000 <br /> Beech Street-Lincoln Avenue <br /> 8, EI Camino ReaV Add WB(Whipple)free right turn and merge lane $274,000 <br /> Whipple Avenue <br /> 9 Hudson StreeU Install traffic signal2 $300,000 <br /> Roosevelt Avenue <br /> �� Main StreeU Install traffic signal 2 $300,000 <br /> Bradford Street <br /> 11 Main StreeU Install traffic signal 2 $300,000 <br /> Woodside Road Ramps <br /> 12 Maple Street/ Install traffic signal 2 $300,000 <br /> Marshall Street <br /> 13 Middlefield Road/ Restripe SB Middlefield to one through,one right lane,and prohibit $30,000 <br /> Jefferson Avenue SB left turns <br /> 14 �iddlefield Road/ Restripe NB and SB(Middlefield)approaches to one left,one $54,000 <br /> Main Street shared through/right,and change phasing from split to protected <br /> �5 Middlefield Road/ 1)Signal Pre-emption $g86,000 <br /> Woodside Road 2)Crosswalks and pedestrian signals <br /> 1)Add second W 8(W hipple)left lane <br /> 2)Add EB(Whipple)left lane and change from permitted to <br /> protected <br /> 16 Veterans Boulevard/ 3)Restripe EB(W hipple)shared though/left as a dedicated through $� 400,000 <br /> Whipple Avenue lane <br /> 4)Add EB(Whipple)right turn overlap <br /> 5) Restripe though lane on SB Veterans Blvd to a shared right/ <br /> through lane <br /> ��t Veterans Boulevard/ Add EB(Whipple)right turn lane $570,000 <br /> Whipple Avenue <br /> /ATTY/RES0.3118/CC RE50 APPROVING AND ADOPTING RESO.#15433 <br /> TRAFFIC IMPACT MITIGATION FEES/TRANSPORTATION IMPACT FEE SCHEDULE MUfF#402 <br /> REV:07-23-15 PT <br /> Page 7 of 30 <br />