Laserfiche WebLink
07/27/2015 <br /> # Project Description Total Cost' <br /> Veterans Boulevard/ 1)Add WB(Woodside)right turn overlap <br /> 18 Woodside Road 2)Add a shared left-through lane on SB Veterans and a second $70,000 <br /> receiving lane on US 101 on-ramp <br /> 19 Doggla Avenue Install traffic signal with left-turn lanes on NB and SB Bay Road 2 $300,000 <br /> 20 Middlefield Road/ provide protected phasing for NB and SB Middlefield Road $100,000 <br /> Douglas Avenue <br /> 21 Second A enue Install traffic signal2 $300,000 <br /> 22 Blomquist StreeU Install signal and provide dedicated left-turn lanesZ $300,000 <br /> Maple Street <br /> Blomquist StreeU 1)Add second NB(E.Bayshore)left and restripe the existing <br /> 23 Seaport Boulevard shared through/left lane as a dedicated through lane. $600,000 <br /> 2)Add second dedicated SB(Blomquist)left turn. <br /> 24• Various intersections(four Install lighted pedestrian crossings $82,000 <br /> locations) <br /> Corridor�npro+�►nents <br /> 25' Blomquist Road Extension Extend to East Bayshore,bridge Redwood Creek $9,700,000 <br /> 26' East Bayshore Road Widen south of Whipple $890,000 <br /> 27' Veterans Boulevard Widen to 4 lanes between Chestnut and Woodside $360,000 <br /> 28, Woodside Road median closures(2) $20,000 <br /> {EI Camino to Valota) <br /> 29 US 101/Woodside Road Interchange improvements $3,000,000 <br /> /Seaport Boulevard Interchange (engineering studies and preliminary design) <br /> 30 Middlefield Road Pedestrian streetscape improvements $2,300,006 <br /> (Woodside to Main) <br /> �lt@►lfll pfOVB/pAllfS <br /> 31, Neighborhood Traffic Alleviate cut-through traffic and speeding in various neighborhoods $1,220,000 <br /> Management Programs <br /> New class I, Ii,and III bicycle facilities per the 2010 General Plan <br /> 32 Bicycle Network (See Appendix A regarding specific improvements included) $9,020,000 <br /> • Middlefield Rd between Flynn Ave and Douglas Ave: Modify $46,000 <br /> to 3 lanes plus bike lanes <br /> • Jefferson Ave between Clinton St and Farm Hill Blvd: Modify $407,000 <br /> to 3 lanes plus bike lanes <br /> . Implement"Complete StreeY' <br /> 33 improvements per the 2010 • Broadway between Maple and Chestnut Streets: Modify to 3 $85� <br /> General Plan lanes plus bike lanes <br /> • Broadway between Charter St and a quarter-mile east of $�00,000 <br /> Douglas Avenue: Modify to 3 lanes plus bike lanes <br /> • Farm Hill Blvd between Jefferson Ave and I-280: Modify to 2 $413,000 <br /> lanes where there is a median and 3 lanes where no median <br /> /ATTY/RE503118/CC RESO APPROVING AND ADOPTING RESO.#15433 <br /> TRAFFIC IMPACT MITIGATION FEES/TRANSPORTATION IMPACT FEE SCHEDULE MUFF#402 <br /> REV:07-23-15 PT <br /> Page 8 of 30 <br />