My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-06-21
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-06-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:17:13 PM
Creation date
6/17/2004 4:00:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
��.I-C.13 <br /> the daily occupancy levels for the four (4) days covered by the Block Two Parking <br /> Survey having the highest daily occupancy levels (the "Block Two PPD"). <br /> D. Caltrain Gazage Parking Survey. <br /> If the City receives any notice of termination of its rights to use the Caltrain Garage for <br /> parking as contemplated by this Agreement, the City shall immediately notify the <br /> Developer and Century. To verify the continuing need for parking spaces in the Caltrain <br /> Garage for powntown public parking, the City shall cause to be completed by a reputable <br /> parking consultant an occupancy survey of the Caltrain Gazage during the Block Two Lot <br /> Peak Periods on eight (8) days selected by Century during any thirty (30) day period <br /> during the next successive "Seasonal Period" as defined above in Section VII-C above <br /> (the "Caltrain Garage Parking Survey") and the City shall distribute to the Developer <br /> and Century, immediately upon receipt, the results of the Caltrain Garage Pazking <br /> Survey. Based upon the results of the Caltrain Garage Parking Survey, the City shall <br /> calculate the Caltrain Garage peak pazking demand by calculating the average of the <br /> daily occupancy levels for the four (4) days covered by the Caltrain Garage Parking <br /> Survey having the highest daily occupancy levels (the "Caltrain PPD"). The City will <br /> replace the lower number of the Block Two RPO or the Caltrain PPD. In addition, if the <br /> Block Two PPD is greater than the Caltrain PPD, the City will use its best efforts to also <br /> replace those additional spaces. <br /> E. Adjustments to Parking in connection with New Develonment on Block Two and <br /> Termination of Parkin� Rights in the Caltrain Gara.�e. <br /> At any time before or after the development of Block Two or the termination of use of the <br /> Caltrain Garage the City may satisfy the Block Two PPD, Caltrain PPD, or fractions thereof; by <br /> any one or combination of the following: (i) new parking spaces constructed by the City in the <br /> Red Zone or the Orange Zone that are made available long-term as free 4-hour customer parking <br /> on nights and weekends, and (ii) other parking in the Red Zone or the Orange Zone, in public or <br /> private facilities, not utilized as of the Effective Date of the DDA (January 8, 2003) for night and <br /> weekend parking that is made available long-term as free 4-hour customer parking on nights and <br /> weekends. As used in this Section VII-E, "long-term" shall mean that at least two (2) years <br /> notice shall be given prior to termination of use. <br /> VIII. STANDARDS OF OPERATION <br /> The Standards of Operation for the Jefferson Garage are set forth in the Reciprocal Easement and <br /> Maintenance Agreement dated <br /> IX. TERM <br /> The total term of this Agreement shall be forty-five (45) years from the Effective Date (the <br /> "Term"). After the first twenty (20) years of the Term (the "Initial Term") the Parties shall <br /> renew this Agreement and attempt to agree upon mutually acceptable modifications to this <br /> Agreement, if any are deemed necessary by the Parties. If such renewals and modifications are <br /> developed to expire before the 45` year following the Effective Date, then the Parties will meet <br /> again and repeat the renewal process. Such terms subsequent to the Initial Term shall be <br /> Atty/Agr/Agr.194 <br /> 061704 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.