My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 ELS Architecture and Urban Design (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 ELS Architecture and Urban Design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 2:24:10 PM
Creation date
8/19/2015 2:24:09 PM
Metadata
Fields
Template:
Agreement
Contractor Name
ELS Architecture and Urban Design
PROJECT NAME
Revised Site concept Design and public process joint facility City and YMCA @ Red Morton Park
RMP File Number
304.5
Date
8/19/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' � EXHIBIT A <br /> � � �. �� <br /> July 16,2015 <br /> Mr. Christopher Beth <br /> Director of Parks, Recreation and Community Services <br /> City of Redwood City <br /> 1400 Roosevelt Avenue <br /> Redwood City,CA 94061 <br /> SUBJECT: PROPOSAL FOR PROFESSIONAL DESIGN SERVICECS <br /> Revised Site Concept Design—Additional Service Request <br /> Public Process and Strategic Communications—New Project Scope <br /> Dear Chris, <br /> We appreciate the opportunity to continue marching forward with the YMCA and the City on a new joint facility for Red Morton <br /> Park. <br /> SCOPE OF SERVICES: <br /> As requested,we are providing a proposal for the following services,which are in addition to those services provided under <br /> our original agreement with the YMCA and the City: <br /> A. New Architectural Concept Site Plan: <br /> a. Prepare a new concept site plan. The new concept site plan will be based upon responses and comments <br /> gathered during ELS'presentation to the Project Steering Committee on May 21,2015. We are not <br /> proposing any engineering or other specialty consultants for this phase of effort. <br /> The new coneept shall be based upon the ELS"D"series;thus the Veterans Memorial Building is assumed <br /> to be razed. <br /> Construction budget(not project budget)for both buildings is assumed to total approximately$80MM. The <br /> parking structure is an additional cost. For budgeting purposes, ELS suggested$21 K/space to construct a <br /> free-standing parking structure above grade,and$50K/space for subgrade parking. <br /> Square footages and programming for both City and YMCA functions will remain as presented on May 21, <br /> 2015. <br /> The new concept shall explore the following: <br /> 1. Architecture Design Charrette: ELS will host a charrette with the City and YMCA to explore <br /> architectural image;style and vernacular,as an important step to move beyond the"box"images <br /> that have been presented to date. <br /> 2. Relocate the YMCA approximately 60'closer to Madison Avenue. <br /> 3. Relocate the parking garage to the rear of the YMCA—the parking garage will now be situated <br /> between the proposed YMCA and the park. This study will also explore the notion of parking as <br /> many as three levels below grade,and restricting the height above grade to approximately 15'. <br /> Architecture Design Chanette: ELS will host a chanette wifh the City and YMCA to explore architectural image,style <br /> and vernacular,as an important sfep to move beyond fhe"box"images thaf have 6een presented to dafe. This will <br /> occur following the public ouheach phase for the project and is not included in the efforf outlined in this proposal. <br /> ARCNITECTURE AN'n URBAN tl£St6N 2D40 AC?OISON STREEi" BER1iELEY,CA 9�703 P 51Q.5�9.2929 �' 510.8A3.33�A 'rV6N�N.ELSARCh.COh� <br /> REV:07-28-15 MLG <br /> ATTY/AGR/2015.148/ELS ARCHITECTURE AND DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.