Laserfiche WebLink
this project has been designed compliant with the city’s Engineering Standards and <br />currently accepted practices. <br /> <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br />exempts projects to update existing lines and facilities. However, the proposed <br />construction will employ stormwater pollution prevention best methods and practices. <br /> <br /> <br /> <br />JAMES O’CONNELL, PE <br /> <br /> <br /> <br />AARON AKNIN, ACIP <br />INTERIM CITY MANAGER <br /> <br />ATTACHMENT <br />1. Project Location Map <br /> <br />6.1.H. - Page 3