My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-08-24 Joint SA and PAF
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-08-24 Joint SA and PAF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 9:02:17 AM
Creation date
8/20/2015 7:19:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br /> <br />August 24, 2015 <br /> <br />SUBJECT <br />Award of Contract – Red Morton Park Synthetic Turf and Tennis Court Renovation <br />Project <br /> <br />RECOMMENDATION <br />By motion, approve, and authorize the City Manager to execute the contract documents <br />and award the standard form contract 00520 for the Red Morton Park Synthetic Turf <br />and Tennis Court Renovation Project to O.C. Jones & Sons, Inc. of Berkeley, CA for <br />their responsive and responsible low base bid of $4,441,700.00 and authorize the City <br />Manager to increase the contract amount, if necessary, up to 10% of the amount <br />awarded. <br /> <br />BACKGROUND <br />Red Morton Community Park is the City’s premier recreational destination that hosts <br />two softball fields, three baseball fields, three soccer fields, three community facilities, a <br />skate park, playgrounds, as well as passive park space. <br /> <br />Eight years ago, the City converted the grass athletic fields into synthetic turf surfaces. <br />This has allowed for significant reductions in both staff resources needed to care for <br />these types of fields as well as an estimated savings of 24 million gallons of water for <br />the three fields over this eight year span. <br /> <br />The synthetic turf fields have reached the end of their functional life, and there is a need <br />to address subsurface stabilization and drainage issues. The playing fields are used <br />year round for soccer, baseball, softball, football, and other field sports by both the local <br />community and visiting tournaments. Because Red Morton Park is the main City park <br />and is relied upon by the entire community for recreation and open space, coordinating <br />the construction to minimize disruption to the community is an essential component of <br />this project. Similarly, the tennis courts are relied upon for public play, tournaments, <br />and lessons, thus requiring coordination and outreach to that specific community. <br /> <br />The City hired Verde Design, Inc., a park and athletic planning consultant, to prepare <br />plans and specifications to renovate the synthetic turf and tennis courts. <br /> <br />ANALYSIS <br />The project consists of the following improvements: <br />6.1.J. - Page 1
The URL can be used to link to this page
Your browser does not support the video tag.