Laserfiche WebLink
<br /> REPORTER'S TRANSCRIPT OF PROCEEDINGS TAKEN 5-24-04 <br />1 Finally, I want to thank the City staff for <br />2 all of their efforts throughout this project. It's <br />3 been a long arduous process, the City staff has <br />4 provided very strong input throughout the process <br />5 to us, and hopefully you'll feel like what we've <br />6 arrived at here with Marina Shores Village is a <br />7 project that the entire community can be proud of. <br />8 And with that, I take any questions. <br />9 MAYOR IRA: Thank you. I hope you didn't <br />10 feel you were rushing through, because I know it <br />11 sounded like you were. We want to make sure you're <br />12 comfortable. <br />13 MR. RIDNER: That's fine. <br />14 MAYOR IRA: Any questions from Council? <br />15 COUNCIL MEMBER HOWARD: Mr. Mayor, I have <br />16 one question about one of the slides, I just wanted <br />17 a clarification. <br />18 Mr. Ridner there's two times you referenced <br />19 the 20,000 jobs by the year 2020, both in <br />20 association Bay Area Governments and in the <br />21 Planning Commission minutes it was mentioned. But <br />22 I wanted to be c 1 ea r, the 20,000 jobs that would be <br />23 generated by the year 2020, are we talking San <br />24 Mateo County or Redwood City? <br />25 MR. RIDNER: Those were Redwood City. <br /> UCCELLI & ASSOCIATES 55 <br /> (650) 952-0774 <br /> .- <br />