Laserfiche WebLink
<br /> REPORTER'S TRANSCRIPT OF PROCEEDINGS TAKEN 5-24-04 <br /> 1 trying to put together a downtown that is viable <br />I 2 and we're asking people to come downtown, and now <br /> 3 we're putting up housing two and a half miles to <br /> 4 the east and asking people to stay there and shop. <br /> S I have, in my study, come up with some <br /> 6 compelling reasons not to approve this project. <br /> 7 This produces a compelling reason to install 9,000 <br /> 8 low flow toilets throughout Redwood City. It <br /> 9 provides the perfect introduction to SO towers and <br /> 10 5600 units along Seaport Boulevard that Cargil will <br /> 11 bring to the Planning Commission in 2010. <br /> 12 This project purposely avoids development <br /> 13 along the Cal train SamTrans corridor just to prove <br />I <br /> 14 how laughable smart growth really is. <br /> 15 This project is placed directly under a <br /> 16 flight path so that those planes could sooth <br /> 17 residents to sleep at night. <br /> 18 This project produces grid lock -- excuse <br /> 19 me, traffic calming on Highway 101 lost with the <br /> 20 current freeway widening project. When Peninsula <br /> 21 residents continually protest how those 17 towers <br /> 22 desiccate the bayside tranquility, <br /> 23 Glenborough-Pauls will deploy their ace in the <br /> 24 hole, a Clingan cloaking device. <br /> 25 Ever since the Embarcadero freeway was <br /> UCCELLI & ASSOCIATES 72 <br /> (650) 952-0774 <br /> .. <br />